
MBZ300
20
Installation
Setting the jumper
X
Insert the jumper (terminator)
in the first and last control pan-
els linked via the CAN-bus.
All the control panels in between
must not have a jumper.
First control panel
With
jumper
Last control panel
With
jumper
Control panel(s)
Without
jumper
CAN-BUS
START
CAN-BUS
END
CAN-BUS
Connection
internal bus
Connection
internal bus
Jumper
position
CAN module
(without connector)
Wiring the CAN module
1
First control panel
2
Control panel(s)
3
Last control panel
4
Start of bus
5
End of bus
6
CAN-bus
7
Shield
Recommended cable type:
2 x 2 x 0.8 mm; up to 500 m
à
A bus-capable fire pro-
tection cable must be
used if necessary.
à
The diagram on the
right shows a com-
pletely connected and
inserted CAN module.
with jumpe
r
without jumper
with jumpe
r
1
2
3
4
5
6
6
7
7
CAN
module
CAN
module
CAN
module
BUS-start
BUS-end
à
Make sure that the shield (7) is connected asymmetrically with the metal housing.
à
The ground of one control panel must not be connected with the ground of another control panel.
à
Watch the bus topology. Do not install any branch lines.
CM with connected CAN module
X
Set the CAN addresses by software during com-
missioning.
46 45 47
46 45 47
Содержание MBZ300
Страница 47: ...MBZ300 47...