3
Electrical Connection
Control cable ........................................................................................................................................14
Note .....................................................................................................................................................15
CAN bus voltage supply ........................................................................................................................15
Attention ..............................................................................................................................................15
Wiring diagram ............................................................................................................................... 16, 17
Key .......................................................................................................................................................18
CAN bus wiring diagram .......................................................................................................................19
Attention ...............................................................................................................................................19
Note .....................................................................................................................................................20
Tools .....................................................................................................................................................20
Using operating device URB for parameter setting.................................................................................26
NRR 240 .............................................................................................................................................26
Measuring range ...................................................................................................................................26
Setting measuring range ................................................................................................................. 26, 27
Switchpoints and proportional range .....................................................................................................28
Establishing switchpoints and proportional range ..........................................................................29 – 31
Calibrating the feedback potentiometer of an external control valve ......................................................31
Attention ...............................................................................................................................................31
Contents
– continued –
Commissioning Procedure
Page
NRR 240 .............................................................................................................................................32
Operation
Bus cable..............................................................................................................................................20
Node ID ................................................................................................................................................21
Factory setting ......................................................................................................................................22
Function of the controller ......................................................................................................................22
Establishing / changing node ID ............................................................................................................23
Attention ...............................................................................................................................................23
Code switch settings .............................................................................................................................23
Dead band ............................................................................................................................................24
Code switch settings .............................................................................................................................24
Establishing / changing the dead band ............................................................................................ 24, 25
Basic Settings
Содержание NRR 2-40
Страница 1: ...1 E N English Level Controller NRR 2 40 Original Installation Instructions 810369 06 ...
Страница 9: ...9 Technical Data continued Dimensions Fig 2 1 1 8 100 73 ...
Страница 10: ...10 Design 0 Fig 3 9 NRR 2 40 9 a ...
Страница 11: ...11 Functional Elements NRR 2 40 Fig 5 Fig 4 1 7 6 5 4 3 2 8 ...
Страница 13: ...13 Installation continued Fig 6 Example of Installation b 9 0 0 Fig 7 20 20 a ...
Страница 17: ...17 Fig 10 NRR 2 40 as continuous controller Wiring diagram Electrical Connection continued d e g l h k i l ...