6
System components
NRG 2640
Level electrode NRG 2640, PN 40
Design
NRR 240
Enclosure of insulating material with terminals for installation in control cabinets.
The terminals are externally accessible.
Clipping onto a 35 mm standardized supporting rail (DIN EN 50022).
External dimensions: 73 x 100 x 118
Scope of supply
NRR 240
1 Level controller NRR 240 plugin unit in plastic case with box terminals
1 Terminating resistor 120 Ω
1 Installation & operating manual
Description
The level controller NRR 240 in conjunction with level electrode NRG 2640 is designed for level
control and monitoring. The level controller features the following functions:
n
Two level limit values with one switchpoint each (highlevel alarm, lowlevel alarm).
n
Threeposition or modulating control within a predefined proportional band.
n
Water level is maintained within the defined control band of the electrode.
The NRR 240 features an optional output for a standard signal 4 – 20 mA.
The level data are transferred from the level electrode NRG 2640 to the level controller or an additional
system component via a CAN data bus.
Explanatory Notes
Function
At regular intervals the level electrode NRG 2640 sends a data telegram to the level controller
NRR 240. The data are transferred via a CAN bus to DIN ISO 11898 using the CANopen protocol. The
transmitted measuring data are then evaluated and allocated to the manually adjusted switchpoints.
Optionally a standard signal 4 – 20 mA is established for external level indication. A relay deenergizing
delay can be set manually with the control terminal and display unit URB 1. To guarantee the correct
functioning and safety of the system the data transmitting cycle is constantly monitored by the level
controller. If the CAN bus line is interrupted the level controller sends a visual signal to indicate a
malfunction and the relays 1 and 4 will be instantaneously deenergized. (fail safe position).
GESTRA's control terminal & display units URB enable advanced features such as adjustable energizing
and deenergizing delays of the output relays (1 to 25sec.)
Содержание NRR 2-40
Страница 1: ...1 E N English Level Controller NRR 2 40 Original Installation Instructions 810369 06 ...
Страница 9: ...9 Technical Data continued Dimensions Fig 2 1 1 8 100 73 ...
Страница 10: ...10 Design 0 Fig 3 9 NRR 2 40 9 a ...
Страница 11: ...11 Functional Elements NRR 2 40 Fig 5 Fig 4 1 7 6 5 4 3 2 8 ...
Страница 13: ...13 Installation continued Fig 6 Example of Installation b 9 0 0 Fig 7 20 20 a ...
Страница 17: ...17 Fig 10 NRR 2 40 as continuous controller Wiring diagram Electrical Connection continued d e g l h k i l ...