Administrator Mode
4
4.5.2 I/O Monitoring Settings
You can set the schedule for I/O monitoring to start.
Note:
The I/O Monitoring Settings are only supported for GV-FE2301 /421 / 4301 / 521.
Figure 4-23
Span 1-3:
Set different time spans during the day to enable I/O monitoring. Each day
can be divided into 3 time spans, shown as Span 1, Span 2, and Span 3. The time
span settings will work from Monday through Sunday.
Weekend:
Enable this option to start I/O monitoring all day on the weekend and select
whether your weekend includes
Saturday and Sunday
or
Only Sunday
.
Special Day:
Enable I/O monitoring on a specified day.
Note:
In Recording Schedule and I/O Monitoring Schedule, if the settings for Special
Day conflict with those for Span 1-3 or Weekend, the Special Day settings will get
priority.
105