Operation
12. When testing under load is complete, turn OFF electrical loads.
13. Set the generator's main circuit breaker to its OFF (or OPEN)
position.
14. Let the engine run at no-load for a few minutes.
15. Set the AUTO/OFF/MANUAL switch to OFF. The engine should
shut down.
2.5
CHECKING AUTOMATIC
OPERATION
To check the system for proper automatic operation, proceed as
follows:
1. Set generator’s main circuit breaker to its OFF (or open) posi-
tion.
2. Check that the AUTO/OFF/MANUAL switch is set to OFF.
3. Turn OFF the utility power supply to the transfer switch, using
means provided (such as a utility main line circuit breaker).
4. Manually set the transfer switch to the UTILITY position, i.e.,
load terminals connected to the utility power source side.
5. Turn ON the utility power supply to the transfer switch, using the
means provided (such as a utility main line circuit breaker).
6. Set the generator's main circuit breaker to its ON (or CLOSED)
position.
7. Set the AUTO/OFF/MANUAL switch to AUTO. The system is
now ready for automatic operation.
8. Turn OFF the utility power supply to the transfer switch.
With the AUTO/OFF/MANUAL switch at AUTO, the engine should
crank and start when the utility source power is turned OFF after a
10 second delay. After starting, the transfer switch should connect
load circuits to the standby side after a five (5) second delay. Let
the system go through its entire automatic sequence of operation.
With the generator running and loads powered by generator AC
output, turn ON the utility power supply to the transfer switch. The
following should occur:
• After about 15 seconds, the switch should transfer loads back
to the utility power source.
• About one minute after re-transfer, the engine should shut down.
3.1 CONTROL PANEL INTERFACE
3.1.1
USING THE AUTO/OFF/MANUAL SWITCH
(FIGURE 3.1)
With the switch set to AUTO, the engine may
crank and start at any time without warning.
Such automatic starting occurs when utility
power source voltage droops below a preset
level or during the normal exercise cycle. To
prevent possible injury that might be caused
by such sudden starts, always set the switch
to OFF and remove the fuses before work-
ing on or around the generator or transfer
switch. Then, place a “DO NOT OPERATE”
tag on the generator panel and on the trans-
fer switch.
1. “AUTO” Position – Selecting this switch activates fully auto-
matic system operation. It also allows the unit to automatically
start and exercise the engine every seven days with the setting
of the exercise timer (see the Setting the Exercise Timer sec-
tion).
2. “OFF” Position – This switch position shuts down the engine.
This position also prevents automatic operation.
3. “MANUAL” Position – Set the switch to MANUAL to crank
and start the engine. Transfer to standby power will not occur
unless there is a utility failure.
3.1.2 SETTING
THE
EXERCISE
TIMER
This generator is equipped with an exercise timer. Once it is set,
the generator will start and exercise every seven days, on the day
of the week and at the time of day specified. During this exercise
period, the unit runs for approximately 12 minutes and then shuts
down. Transfer of loads to the generator output does not occur
during the exercise cycle unless utility power is lost.
Figure 3.1 – 8/10/13 KVA Generator Control Panel
Escape
MAIN FUSE
AUTO OFF MANUAL
7.5 AMP
Enter
INSTALLATION ASSISTANT
Interconnect System Self Test Feature
(follow the on-screen
prompts)
Upon power up, this controller will go through a system self test
which will check for the presence of utility voltage on the DC
circuits. This is done to prevent damage if the installer mistakenly
connects AC utility power sense wires into the DC terminal block. If
utility voltage is detected, the controller will display a warning mes-
sage and lock out the generator, preventing damage to the control-
ler. Power to the controller must be removed to clear this warning.
Utility voltage must be turned on and present at the N1 and N2
terminals inside the generator control panel for this test to be
performed and pass.
NOTE:
DAMAGE CAUSED BY MISWIRING OF THE INTERCONNECT
WIRES IS NOT WARRANTABLE!
Содержание 0j2083
Страница 30: ...28 Installation Diagrams Drawing No 0J3244 B ...
Страница 31: ...29 Drawing No 0J3244 B Installation Diagrams ...
Страница 32: ...Part No 0J2083 Revision G 04 02 13 Printed in U S A ...
Страница 61: ...59 59 Notas ...
Страница 62: ...Nº de parte 0J2083 Revisión G 02 04 13 Impreso en EE UU ...
Страница 90: ...88 ДЛЯ ЗАМЕТОК ...
Страница 91: ...89 89 ДЛЯ ЗАМЕТОК ...
Страница 92: ... элемента 0J2083 Редакция G 04 02 13 Напечатано в США ...