BCT_T Rev.00 05-2015
pag. 129
8.3
– EXTRAORDINARY MAINTENANCE
If the appliance needs extraordinary maintenance, or if operating anomalies occur that are not described in this manual,
contact the manufacturer.
8.4
– SIGNALS AND INDICATIONS
The following table illustrates the meaning of the signalling LEDS.
LED
Meaning
Blast chilling LED.
If it is on:
-
blast chilling will be in progress (or has been performed).
If flashing:
-
a blast chilling and storage cycle will have been selected.
Deep freezing LED.
If it is on:
-
a soft deep freezing cycle will be in progress (or has been performed).
If flashing:
-
a soft deep freezing and storage cycle will have been selected.
HARD
hard blast chilling/deep freezing LED
If it is on:
-
hard blast chilling or deep freezing will be in progress (or has been performed).
If flashing:
-
a hard blast chilling and storage cycle or a deep freezing and storage cycle will have been
selected.
temperature-controlled blast chilling/temperature-controlled deep freezing LED.
If it is on:
-
a temperature-controlled blast chilling and storage cycle or a temperature-controlled deep
freezing and storage cycle will have been performed.
-
temperature-controlled blast chilling or deep freezing will be in progress.
If flashing:
-
a temperature-controlled blast chilling and storage cycle or a temperature-controlled deep
freezing and storage cycle will have been selected.
-
the verification test for the correct insertion of the needle probe will not have been completed
successfully
-
needle probe heating will be in progress.
time-controlled blast chilling/time-controlled deep freezing LED.
If it is on:
-
a time-controlled blast chilling and storage cycle or a time-controlled deep freezing and storage
cycle will have been performed.
-
time-controlled blast chilling or deep freezing will be in progress.
If flashing:
-
a time-controlled blast chilling and storage cycle or a time-controlled deep freezing and storage
cycle will have been selected.
-
setting the real date and time will be in progress.
Содержание New Runner Series
Страница 2: ...BCT_T Rev 00 05 2015 pag 2...
Страница 7: ...BCT_T Rev 00 05 2015 pag 7 1 2 DICHIARAZIONE DI CONFORMITA...
Страница 74: ...BCT_T Rev 00 05 2015 pag 74 1 2 DECLARATION OF CONFORMITY...
Страница 137: ...BCT_T Rev 00 05 2015 pag 137...
Страница 138: ...BCT_T Rev 00 05 2015 pag 138...