
Content
I
2
6.
Commissioning / Operation ................................................................... 28
6.1
Commissioning
28
6.1.1
Functional check before operation
28
6.2
Operation
29
6.2.1
Press process work steps
29
7.
Decommissioning ................................................................................... 30
7.1
Shutting down the press (longer period of time)
30
7.2
Relocate the press
30
7.3
Storing the system
31
7.4
Disposing of the press
31
8.
Setup and accessories ............................................................................ 32
8.1
Setup process
32
8.1.1
Tightening torques for screws
33
8.1.2
Remove the clamped piece (from 5 HKPV)
34
8.1.3
Clamping the tool
35
8.1.4
Setup
36
8.1.5
Adjust the height
38
8.1.6
Adjusting the stroke length and pressing force (only for type 8/12 and
8/16)
39
8.1.7
Changing the hand lever from right to left
40
9.
Service and maintenance ....................................................................... 42
9.1
Maintenance safety
42
9.2
Technical Support
44
9.2.1
Cleaning the press
45
9.2.2
Lubricate the prism guide
46
9.3
Packing system parts
47
9.4
Wear and spare parts lists
47
10.
Faults ..................................................................................................... 48
10.1
Technical Support
49
10.1.1
Fault table
49
10.1.2
Adjusting the Adjustment Gib
50
10.1.3
Changing the return spring
51
11.
Spare parts and ordering ....................................................................... 53
11.1
Spare parts
53
11.2
Order
53
12.
Appendix ................................................................................................ 54
12.1
Register directory
54
Содержание 2,5 HKPE
Страница 60: ... ...