
Tighten the screws (66) to a max. tightening torque of 1 Nm.
10.5.6 Removing the Evaluation Electronics
Fig.35
Carry out the following steps:
1.
Loosen all the cables and connectors on the evaluation electronics and
remove them.
2.
Unscrew and remove the screws (57).
3.
Grip the evaluation electronics (43) by the top edges and take out of the base
(5). Ensure ESD-compliant handling.
®
Done
Maintenance
Dismantling the Control Top into its Components
430BAL014912EN_3
25.01.2024
67
Содержание FLOWVENT
Страница 83: ...Appendix 430BAL014912EN_3 25 01 2024 83...
Страница 84: ......