Handling and Assembly
Installing the pump in the reception pit
2008-9015-001
01-2017
Attention!
When installing the U-bolt, make sure the U-bolt does not compress
grease lines.
● Position the pump against the
support (8) while making sure it
stays vertical;
● Attach the pump to the support using
the U-bolt (9). Make sure the U-bolt
does not compress the grease lines;
● Tighten the U-bolt to secure the
pump onto the support.
8
9