Handling and Assembly
Control panel installation
2008-9015-001
01-2017
5.8
Control panel installation
Danger!
High voltage! Rick of electric shock!
All electric connections must be performed by a qualified electrician.
Follow local and national electric standards.
Warning!
Risk of electric shock!
Connect the control panel and all conductive equipments to an
equipotential bond.
This symbol indicates that the terminal must be connected to earth
ground.
Refer to the manufacturer's installation pre-requisites.
Step #1: Check the control panel electric components
● Before performing any electric connection, tighten the screws of all the
electric components inside the control panel.
● Make sure all wires are properly connected and secured.
Step #2: Locate the control panel
● On a solid wall, at a convenient height, sheltered from sun ray and weather
conditions;
● In a convenient area for the operator;
● Near the pump;
● Near the external cut-off switch;
● In an area having free space around the control panel for aeration purposes.
Step #3: Wall mount the control panel
● Place the control panel on the wall and use the holes to sketch the drill
pattern;
● Drill through the bolt pattern;
● Secure the control panel in place. DO NOT OVERTIGHTEN.