Handling and Assembly
Connecting the discharge to the evacuation line
2008-9015-001
01-2017
5.11
Connecting the discharge to the evacuation line
● Assemble and connect the
evacuation line (1) to the pump
discharge hose (2) using a collar (3).
Connection to an outside evacuation
line
To ensure proper drainage of the
evacuation line, connect the pump
outlet to a PVC pipe long enough to
provide a minimum of 5% slope towards
the main pit.
Connection to an underground
evacuation line
To ensure proper drainage of the
evacuation line, connect the pump
outlet to a PVC pipe buried under the
frost line. The underground line must
provide a minimum of 1% slope towards
the main pit.
1
3
2