GE Multilin
T60 Transformer Protection System
5-89
5 SETTINGS
5.4 SYSTEM SETUP
5
3.
Configure source
n
(source 2 for this example) as the current from CTY in Winding 1 in the
SYSTEM SETUP
SIGNAL
SOURCES
SOURCE 1(4)
settings menu.
SOURCE 2 NAME:
“WDG 1Y”
SOURCE 2 PHASE CT:
“F5”
SOURCE 2 GROUND CT:
“None”
SOURCE 2 PHASE VT:
“None”
SOURCE 2 AUX VT:
“None”
4.
Configure source
n
(source 3 for this example) to be used as the current in Winding 2 in the
SYSTEM SETUP
SIGNAL
SOURCES
SOURCE 1(4)
settings menu.
SOURCE 3 NAME:
“WDG 2"
SOURCE 3 PHASE CT:
“M1”
SOURCE 3 GROUND CT:
“M1”
SOURCE 3 PHASE VT
: “None”
SOURCE 3 AUX VT:
“None”
5.
Configure the source setting of the transformer windings in the
SYSTEM SETUP
TRANSFORMER
WINDING n
set-
tings menu.
WINDING 1 SOURCE:
“WDG 1X”
WINDING 2 SOURCE:
“WDG 1Y”
WINDING 3 SOURCE:
“WDG 2"
SETUP METHOD B (ALTERNATE)
This approach adds the current from each phase of the CT1 and CT2 together to represent the total winding 1 current. The
procedure is shown below.
1.
Enter the settings for each set of CTs in the
SYSTEM SETUP
AC INPUTS
CURRENT BANK
settings menu, as shown for
Method A above.
2.
Configure Source
n
(Source 1 for this example) to be used as the summed current in Winding 1 in the
SYSTEM SETUP
SIGNAL SOURCES
SOURCE n
settings menu.
SOURCE 1 NAME:
“WDG 1"
SOURCE 1 PHASE CT:
“F1 + F5”
SOURCE 1 GROUND CT:
“None”
SOURCE 1 PHASE VT:
“None”
SOURCE 1 AUX VT:
“None”
3.
Configure Source
n
(Source 2 for this example) to be used as the Winding 2 current in the
SYSTEM SETUP
SIGNAL
SOURCES
SOURCE n
settings menu.
SOURCE 2 NAME:
“WDG 2"
SOURCE 2 PHASE CT:
“M1”
SOURCE 2 GROUND CT:
“M1”
SOURCE 2 PHASE VT:
“None”
SOURCE 2 AUX VT:
“None”
Содержание UR T60
Страница 10: ...x T60 Transformer Protection System GE Multilin TABLE OF CONTENTS ...
Страница 14: ...xiv T60 Transformer Protection System GE Multilin 0 1 BATTERY DISPOSAL 0 BATTERY DISPOSAL 0 ...
Страница 34: ...1 20 T60 Transformer Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 436: ...5 298 T60 Transformer Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 492: ...8 18 T60 Transformer Protection System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 510: ...9 18 T60 Transformer Protection System GE Multilin 9 6 COMMISSIONING TEST TABLES 9 COMMISSIONING 9 ...
Страница 678: ...C 30 T60 Transformer Protection System GE Multilin C 7 LOGICAL NODES APPENDIX C C ...
Страница 688: ...D 10 T60 Transformer Protection System GE Multilin D 1 IEC 60870 5 104 PROTOCOL APPENDIX D D ...
Страница 700: ...E 12 T60 Transformer Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...