GE Multilin
T60 Transformer Protection System
5-125
5 SETTINGS
5.5 FLEXLOGIC™
5
ELEMENT
Non-volatile latches
LATCH 1 ON
LATCH 1 OFF
Non-volatile latch 1 is ON (Logic = 1)
Non-volatile latch 1 is OFF (Logic = 0)
LATCH 2 to 16
Same set of operands as shown for LATCH 1
ELEMENT:
Load encroachment
LOAD ENCHR PKP
LOAD ENCHR OP
LOAD ENCHR DPO
Load encroachment has picked up
Load encroachment has operated
Load encroachment has dropped out
ELEMENT:
Neutral
instantaneous
overcurrent
NEUTRAL IOC1 PKP
NEUTRAL IOC1 OP
NEUTRAL IOC1 DPO
Neutral instantaneous overcurrent 1 has picked up
Neutral instantaneous overcurrent 1 has operated
Neutral instantaneous overcurrent 1 has dropped out
NEUTRAL IOC2 to
Same set of operands as shown for NEUTRAL IOC1
ELEMENT:
Neutral overvoltage
NEUTRAL OV1 PKP
NEUTRAL OV1 DPO
NEUTRAL OV1 OP
Neutral overvoltage element 1 has picked up
Neutral overvoltage element 1 has dropped out
Neutral overvoltage element 1 has operated
NEUTRAL OV2 to 3
Same set of operands as shown for NEUTRAL OV1
ELEMENT:
Neutral time
overcurrent
NEUTRAL TOC1 PKP
NEUTRAL TOC1 OP
NEUTRAL TOC1 DPO
Neutral time overcurrent 1 has picked up
Neutral time overcurrent 1 has operated
Neutral time overcurrent 1 has dropped out
NEUTRAL TOC2 to 6
Same set of operands as shown for NEUTRAL TOC1
ELEMENT:
Neutral directional
overcurrent
NTRL DIR OC1 FWD
NTRL DIR OC1 REV
Neutral directional overcurrent 1 forward has operated
Neutral directional overcurrent 1 reverse has operated
ELEMENT:
Overfrequency
OVERFREQ 1 PKP
OVERFREQ 1 OP
OVERFREQ 1 DPO
Overfrequency 1 has picked up
Overfrequency 1 has operated
Overfrequency 1 has dropped out
OVERFREQ 2 to 4
Same set of operands as shown for OVERFREQ 1
ELEMENT:
Phase directional
overcurrent
PH DIR1 BLK A
PH DIR1 BLK B
PH DIR1 BLK C
PH DIR1 BLK
Phase A directional 1 block
Phase B directional 1 block
Phase C directional 1 block
Phase directional 1 block
ELEMENT:
Phase distance
PH DIST Z1 PKP
PH DIST Z1 OP
PH DIST Z1 OP AB
PH DIST Z1 OP BC
PH DIST Z1 OP CA
PH DIST Z1 PKP AB
PH DIST Z1 PKP BC
PH DIST Z1 PKP CA
PH DIST Z1 SUPN IAB
PH DIST Z1 SUPN IBC
PH DIST Z1 SUPN ICA
PH DIST Z1 DPO AB
PH DIST Z1 DPO BC
PH DIST Z1 DPO CA
Phase distance zone 1 has picked up
Phase distance zone 1 has operated
Phase distance zone 1 phase AB has operated
Phase distance zone 1 phase BC has operated
Phase distance zone 1 phase CA has operated
Phase distance zone 1 phase AB has picked up
Phase distance zone 1 phase BC has picked up
Phase distance zone 1 phase CA has picked up
Phase distance zone 1 phase AB IOC is supervising
Phase distance zone 1 phase BC IOC is supervising
Phase distance zone 1 phase CA IOC is supervising
Phase distance zone 1 phase AB has dropped out
Phase distance zone 1 phase BC has dropped out
Phase distance zone 1 phase CA has dropped out
PH DIST Z2 to 3
Same set of operands as shown for PH DIST Z1
ELEMENT:
Phase
instantaneous
overcurrent
PHASE IOC1 PKP
PHASE IOC1 OP
PHASE IOC1 DPO
PHASE IOC1 PKP A
PHASE IOC1 PKP B
PHASE IOC1 PKP C
PHASE IOC1 OP A
PHASE IOC1 OP B
PHASE IOC1 OP C
PHASE IOC1 DPO A
PHASE IOC1 DPO B
PHASE IOC1 DPO C
At least one phase of phase instantaneous overcurrent 1 has picked up
At least one phase of phase instantaneous overcurrent 1 has operated
All phases of phase instantaneous overcurrent 1 have dropped out
Phase A of phase instantaneous overcurrent 1 has picked up
Phase B of phase instantaneous overcurrent 1 has picked up
Phase C of phase instantaneous overcurrent 1 has picked up
Phase A of phase instantaneous overcurrent 1 has operated
Phase B of phase instantaneous overcurrent 1 has operated
Phase C of phase instantaneous overcurrent 1 has operated
Phase A of phase instantaneous overcurrent 1 has dropped out
Phase B of phase instantaneous overcurrent 1 has dropped out
Phase C of phase instantaneous overcurrent 1 has dropped out
PHASE IOC2 to 12
Same set of operands as shown for PHASE IOC1
Table 5–11: T60 FLEXLOGIC™ OPERANDS (Sheet 3 of 8)
OPERAND TYPE
OPERAND SYNTAX
OPERAND DESCRIPTION
Содержание UR T60
Страница 10: ...x T60 Transformer Protection System GE Multilin TABLE OF CONTENTS ...
Страница 14: ...xiv T60 Transformer Protection System GE Multilin 0 1 BATTERY DISPOSAL 0 BATTERY DISPOSAL 0 ...
Страница 34: ...1 20 T60 Transformer Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 436: ...5 298 T60 Transformer Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 492: ...8 18 T60 Transformer Protection System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 510: ...9 18 T60 Transformer Protection System GE Multilin 9 6 COMMISSIONING TEST TABLES 9 COMMISSIONING 9 ...
Страница 678: ...C 30 T60 Transformer Protection System GE Multilin C 7 LOGICAL NODES APPENDIX C C ...
Страница 688: ...D 10 T60 Transformer Protection System GE Multilin D 1 IEC 60870 5 104 PROTOCOL APPENDIX D D ...
Страница 700: ...E 12 T60 Transformer Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...