background image

Any deviation from these drawings must be communicated in writing to and reviewed by your local GE

healthcare installation project manager prior to making changes.

Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver

the equipment to the installation site.  If desired, your local GE healthcare installation project manager can
supply a reference list of rigging contractors.

New construction requires the following;
1.

Secure area for equipment,

2.

Power for drills and other test equipment,

3.

Capability for image analysis,

4.

Restrooms.

Provide for refuse removal and disposal (e.g. crates, cartons, packing)

It is the customer's responsibility to contract a vibration consultant/engineer to implement site design
modifications to meet the GE vibration specification. Refer to the system preinstallation manual for the

vibration specification.

CUSTOMER SITE READINESS REQUIREMENTS

TYPCIAL MOVING MAGNETIC MASS

DISTANCE RADIALLY

DISTANCE AXIALLY

Carts, Gurneys 100-400 lbs [45-182 kg]

3 Gauss line

3 Gauss line

Forklifts, small elevator, cars, minivans vans, pickup trucks, ambulances

(objects greater than 400 lbs [182 kg])

15.5 FT

4.72 M

24.6 FT

7.5 M

Buses and trucks (dump, tractor trailer, utility, fire trucks)

18.1 FT

5.52 M

28.75 FT

8.76 M

MAGNETIC INTERFERENCE SPECIFICATIONS

The customer must establish protocols to prevent persons with cardiac  pacemakers, neurostimulators, and

biostimulation devices from entering  magnetic fields of greater than 5 gauss (exclustion zone).
Main power transformers must remain outside the 3 gauss field. EMI < 20mg rms ac.  EMI < 5.87mg dc.
Potential exists under fault conditions that the 5 gauss line may expand radially to 9.35 ft. [2.85 m] and axially

to 14.27 ft. [4.35 m] for 1 seconds or less.  It should be noted that normal rampdowns or magnet rundown

unit initiated quenches will not cause the magnetic field to expand.
It is recommended every site consider the event of a quench and plan  accordingly (such as placing 5 gauss
warning signs at expanded locations).

The ferrous metal objects listed below must not move into or inside of the  moving metal sensitivity line
during scans.

Please refer to pre-installation checklist in pre-installation manual listed on  the cover sheet for items critical to
image quality.

1. The layout should be arranged so that the 5g line is contained to the magnet room. If not possible, a barrier is

recommended to prevent entry to the 5g field area.

2. The spaces around, above, and below the magnet must be reviewed for effects of the 5g, 3g, 1g, and .5g fields.

Refer to the proximity limit chart in the MR pre-installation manual referenced on the cover sheet.

3. For moving metal, the restriction lines typically extend outside of the MR space. Please confirm there are no

moving metal concerns within these areas.  An EMI study is recommended if the restriction lines are violated.

4. For vibration, analysis to be completed as required per pre-installation manual.
5. For EMI, review the site for the location of the main electrical feeders, AC devices, or distribution systems. An

EMI study is recommended if large AC systems are nearby.

6. Details of the floor below the magnet must be reviewed. The structural engineer must verify that the quantity

of steel in the volume 10ft [3.1m] x 10ft [3.1m] x 1ft [.3m] deep (below the magnet) does not exceed the
allowable steel content as given in the MR pre-installation manual referenced on the cover sheet.

7. All access/computer flooring is to be removed in both the magnet room and equipment room.

Responsibility for the coordination, design, engineering, and site preparation resides with the customer and their
project architects and contractors. GE does not, by providing reviews and furnishing comments and assistance,
accept any responsibility beyond its obligations as defined in the MR system, sale/purchase agreement.

MRI SITE PLANNING REMINDERS

Broadband RF noise is a single transient or continuous series of transient disturbances caused by an electrical
discharge. Low humidity environmental conditions will have higher probability of electrical discharge. The electrical
discharge can occur due to electrical arcing (micro arcing) or merely static discharge. Some potential sources
capable of producing electrical discharge include:

Loose hardware/fasteners vibration or movement (electrical contunuity must always be maintained)
Flooring material including raised access flooring (panels & support hardware) and carpeting
Electrical fixtures (i.e. Lighting fixtures, track lighting, emergency lighting, battery chargers, outlets)
Ducting for HVAC and cable routing
RF shield seals (walls, doors, windows etc.)

For additional information regarding image quality, refer to the pre-installation manual listed on the cover sheet.

IMAGE QUALITY CONSIDERATIONS

Date

Rev

/24

EN-MRI-TYP-SIGNA_EXPLORER-WEB.DWG

A

03/Aug/2018

SIGNA EXPLORER /SIGNA CREATOR

Typical

A1 - General Notes

03

Содержание SIGNA EXPLORER

Страница 1: ...mplete set of final issue drawing GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings however caused All dimensions are in millimeters unless otherwise spe...

Страница 2: ...licable Power for MR compressor Chiller is available Ensure cryogen venting system is available for magnet connection Exhaust fan system is installed and operational per GE requirements Status of work...

Страница 3: ...ned to the magnet room If not possible a barrier is recommended to prevent entry to the 5g field area 2 The spaces around above and below the magnet must be reviewed for effects of the 5g 3g 1g and 5g...

Страница 4: ...contingent on a 72 in corridor width C 26 Minimum opening for is 43 in w x 82 in h contingent on a 96 in corridor width C 27 Counter top for equipment provide grommeted openings as required to route c...

Страница 5: ...efine RF shield s inset according to provisions made by the RF Shield vendor Warning 5 Gauss line outside the Magnet room limits MAGNET ROOM CONTROL ROOM FRONT VIEW WITH MAGNETIC FIELD 6 4 3 2 1 1 3 1...

Страница 6: ...ency generators Commercial laundry equipment Food preparation area Water cooling equipment HVAC equipment Major mechanical equipment room Credit cards watches and clocks Air conditioning equipment Fue...

Страница 7: ...net cover is adjustable between 100 200mm 4 8 in D PP cover is adjustable between 300 400mm 11 8 15 7 in SYSTEM CABINET Top View PENETRATION PANEL Top View D D PENETRATION PANEL Front View Cut out cen...

Страница 8: ...0 4 in 401 15 79 in 750 29 52 in 700 27 56 in 377 14 84 in 330 12 98 in 208 8 19 in GLOBAL OPERATOR CABINET GOC Center of Gravity SCALE 1 10 TOP VIEW FRONT VIEW SIDE VIEW 300 11 8 in PENETRATION PANEL...

Страница 9: ...ravity GAS SUPPLY RETURN WATER OUT IN 232 9 13 in 450 17 72 in 103 4 06 in 276 10 87 in 153 6 02 in 450 17 72 in 800 31 5 in 153 6 02 in 153 6 02 in BLOWER BOX A Air in take clearance B Duct trim cove...

Страница 10: ...ROUTING Floor must be able to withstand a moving load of 5320 daN Minimum Opening Height 2 5m 98 5 in width 2 5m 98 5 in Maximum slope 30 degree STRAIGHT PATH Rigging wheels required PATH WITH 90 DEGR...

Страница 11: ...safety all removable items within the magnet room such as faucet handles drain covers switch box cover plates light fixture components mounting screws etc Must be non magnetic If you have a specific...

Страница 12: ...ng 4 Structural wall backing for Magnet Rundown Unit 5 Structural wall backing for Main Disconnect Panel 6 Structural wall backing for Magnet Monitor 7 Floor levelness area for Systems Cabinet Date Re...

Страница 13: ...ded to the structural elements and not to common screed for magnet anchoring table dock anchor hole VibroAcoustic Pad weight 8 kg 17 lbs each Seismic anchor holes 1346 53 in 673 26 5 in 250 9 8 in 175...

Страница 14: ...supplied and installed by the customer or his contractors For complete design and requirements specifications and guidelines refer to the pre installation manual system cooling cryogen venting wavegu...

Страница 15: ...xhaust Intake Vent MAGNET ROOM CONTROL ROOM RF Filter ON OFF Manual fan switches in parallel Ductwork Ductwork MAGNET ROOM VENTING REQUIREMENTS HVAC VENT REQUIREMENTS HVAC vendor must comply with Magn...

Страница 16: ...ow 30 l min 8 gpm Temperature rise at maximum flow Temperature rise at minimum flow Maximum inlet pressure of Chiller Cryo Compressor 690 kPa 100 psi Minimum inlet pressure of Chiller Cryo Compressor...

Страница 17: ...PIPE DETAIL MAGNET VENT ADAPTER Do not remove or modify the vent adaptor bolted to the magnet VENT PIPE 610 mm 24 in may be cut to a minimum of 100 mm 4 in VENTGLAS CONNECTOR WAVEGUIDE Additional pipe...

Страница 18: ...10 63 4 52 31 17 8 22 56 68 2 26 15 58 4 11 28 34 10 in 250mm 0 20 0 6 1 0 03 0 68 0 55 3 79 0 82 5 65 0 27 1 86 0 04 2 83 20 40 6 1 12 2 0 07 1 58 0 82 5 65 1 51 10 41 0 41 2 83 0 75 5 17 40 60 12 2...

Страница 19: ...n direct as possible otherwise may result in the need for greater than standard cable lengths refer to the interconnection diagram for maximum usable lengths point to point 8 Conduit turns to have lar...

Страница 20: ...ephone lines network connection Duplex hospital grade dedicated outlet 120 v emergency single phase power 15a Duplex hospital grade dedicated outlet 120 v single phase outlet routed through RF filter...

Страница 21: ...P SIGNA_EXPLORER WEB DWG A 03 Aug 2018 SIGNA EXPLORER SIGNA CREATOR Typical E3 Electrical Elevations 21 MAGNET ROOM EQUIPMENT ROOM 8 9 TBD TBD 5 4 7 9 9 8 CONTROL ROOM 5 4 3 2 TBD TBD TBD TBD TBD TBD...

Страница 22: ...THE FLOOR NOT TO SCALE Removable coverplate DUCT ON THE WALL Date Rev 24 EN MRI TYP SIGNA_EXPLORER WEB DWG A 03 Aug 2018 SIGNA EXPLORER SIGNA CREATOR Typical E4 Electrical Details 22 CABLE MANAGEMENT...

Страница 23: ...E EMERGENCY OFF BUTTONS ARE SUPPLIED WITH GE MDP OPTION EMERGENCY OFF BUTTONS ARE CUSTOMER SUPPLIED IF GE MDP OPTION NOT USED CIRCUIT BREAKERS ARE PROVIDED FOR PDU CRYO COOLER COMPRESSOR CHILLER GRADI...

Страница 24: ...5 75m 13 94 51 67 ft 17 98 m 59 ft 9 56 m 31 ft 12 5 m 41 ft 12 8m 42 ft 17 4m 57 ft 2 55 16 13m 8 35 52 9 ft 12 2m 40 ft 21 00 m 68 ft 4 3 11 3m 14 1 37 1 ft GOC MAGNET ROOM CONTROL ROOM EQUIPMENT RO...