C1 - 01 - Cover Sheet
C2 - 02 - Disclaimer - Site Readiness
A1 - 03 - 

General Notes

A2 - 04 - Equipment Layout
A3 - 05 - Section Views
A4 - 06 - Acoustic - Proximity Limits
A5 - 07 - RF Shielding
A6 - 08 - Equipment Dimensions (1)
A7 - 09 - Equipment Dimensions (2)
A8 - 10 - Delivery
S1 - 11 - Structural Notes
S2 - 12 - Structural Layout

S3 - 13 - Structural Details
M1 - 14 - Mechanical Layout
M2 - 15 - HVAC - Venting
M3 - 16 - Chilled Water
M4 - 17 - Cryogenics (1)
M5 - 18 - Cryogenics (2)
E1 - 19 - Electrical Notes
E2 - 20 - Electrical Layout
E3 - 21 - Electrical Elevation
E4 - 22 - Electrical Details
E5 - 23 - Power Requirements
E6 - 24 - Interconnections

----

----

SIGNA EXPLORER /SIGNA CREATOR

PMM

GE Healthcare

GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete

set  of  final  issue  drawing.  GE  cannot  accept  responsibility  for  any  damage  due  to  the  partial  use  of  GE  final  issue  drawings,  however  caused.  All

dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work

due to scaling from these drawings.

/24

EN-MRI-TYP-SIGNA_EXPLORER-WEB.DWG

----

----

PMM

5538857-1EN

----

1/4"=1'-0"

----

03/Aug/2018

Typical

A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in

incomplete documentation required for site design and preparation.

Pre Installation documents for GE Healthcare products can be accessed on the web at: 

www.gehealthcare.com/siteplanning

-

Drawn by

Verified by

PIM Manual

Sheet

Format

Concession

Scale

Date

File Name

Rev

S.O. (GON)

A3

8

REV

DATE

MODIFICATIONS

A

10/Jul/2018

First issue drawing / Final study based on MRI-

FINAL STUDY

01

Содержание SIGNA EXPLORER

Страница 1: ...mplete set of final issue drawing GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings however caused All dimensions are in millimeters unless otherwise spe...

Страница 2: ...licable Power for MR compressor Chiller is available Ensure cryogen venting system is available for magnet connection Exhaust fan system is installed and operational per GE requirements Status of work...

Страница 3: ...ned to the magnet room If not possible a barrier is recommended to prevent entry to the 5g field area 2 The spaces around above and below the magnet must be reviewed for effects of the 5g 3g 1g and 5g...

Страница 4: ...contingent on a 72 in corridor width C 26 Minimum opening for is 43 in w x 82 in h contingent on a 96 in corridor width C 27 Counter top for equipment provide grommeted openings as required to route c...

Страница 5: ...efine RF shield s inset according to provisions made by the RF Shield vendor Warning 5 Gauss line outside the Magnet room limits MAGNET ROOM CONTROL ROOM FRONT VIEW WITH MAGNETIC FIELD 6 4 3 2 1 1 3 1...

Страница 6: ...ency generators Commercial laundry equipment Food preparation area Water cooling equipment HVAC equipment Major mechanical equipment room Credit cards watches and clocks Air conditioning equipment Fue...

Страница 7: ...net cover is adjustable between 100 200mm 4 8 in D PP cover is adjustable between 300 400mm 11 8 15 7 in SYSTEM CABINET Top View PENETRATION PANEL Top View D D PENETRATION PANEL Front View Cut out cen...

Страница 8: ...0 4 in 401 15 79 in 750 29 52 in 700 27 56 in 377 14 84 in 330 12 98 in 208 8 19 in GLOBAL OPERATOR CABINET GOC Center of Gravity SCALE 1 10 TOP VIEW FRONT VIEW SIDE VIEW 300 11 8 in PENETRATION PANEL...

Страница 9: ...ravity GAS SUPPLY RETURN WATER OUT IN 232 9 13 in 450 17 72 in 103 4 06 in 276 10 87 in 153 6 02 in 450 17 72 in 800 31 5 in 153 6 02 in 153 6 02 in BLOWER BOX A Air in take clearance B Duct trim cove...

Страница 10: ...ROUTING Floor must be able to withstand a moving load of 5320 daN Minimum Opening Height 2 5m 98 5 in width 2 5m 98 5 in Maximum slope 30 degree STRAIGHT PATH Rigging wheels required PATH WITH 90 DEGR...

Страница 11: ...safety all removable items within the magnet room such as faucet handles drain covers switch box cover plates light fixture components mounting screws etc Must be non magnetic If you have a specific...

Страница 12: ...ng 4 Structural wall backing for Magnet Rundown Unit 5 Structural wall backing for Main Disconnect Panel 6 Structural wall backing for Magnet Monitor 7 Floor levelness area for Systems Cabinet Date Re...

Страница 13: ...ded to the structural elements and not to common screed for magnet anchoring table dock anchor hole VibroAcoustic Pad weight 8 kg 17 lbs each Seismic anchor holes 1346 53 in 673 26 5 in 250 9 8 in 175...

Страница 14: ...supplied and installed by the customer or his contractors For complete design and requirements specifications and guidelines refer to the pre installation manual system cooling cryogen venting wavegu...

Страница 15: ...xhaust Intake Vent MAGNET ROOM CONTROL ROOM RF Filter ON OFF Manual fan switches in parallel Ductwork Ductwork MAGNET ROOM VENTING REQUIREMENTS HVAC VENT REQUIREMENTS HVAC vendor must comply with Magn...

Страница 16: ...ow 30 l min 8 gpm Temperature rise at maximum flow Temperature rise at minimum flow Maximum inlet pressure of Chiller Cryo Compressor 690 kPa 100 psi Minimum inlet pressure of Chiller Cryo Compressor...

Страница 17: ...PIPE DETAIL MAGNET VENT ADAPTER Do not remove or modify the vent adaptor bolted to the magnet VENT PIPE 610 mm 24 in may be cut to a minimum of 100 mm 4 in VENTGLAS CONNECTOR WAVEGUIDE Additional pipe...

Страница 18: ...10 63 4 52 31 17 8 22 56 68 2 26 15 58 4 11 28 34 10 in 250mm 0 20 0 6 1 0 03 0 68 0 55 3 79 0 82 5 65 0 27 1 86 0 04 2 83 20 40 6 1 12 2 0 07 1 58 0 82 5 65 1 51 10 41 0 41 2 83 0 75 5 17 40 60 12 2...

Страница 19: ...n direct as possible otherwise may result in the need for greater than standard cable lengths refer to the interconnection diagram for maximum usable lengths point to point 8 Conduit turns to have lar...

Страница 20: ...ephone lines network connection Duplex hospital grade dedicated outlet 120 v emergency single phase power 15a Duplex hospital grade dedicated outlet 120 v single phase outlet routed through RF filter...

Страница 21: ...P SIGNA_EXPLORER WEB DWG A 03 Aug 2018 SIGNA EXPLORER SIGNA CREATOR Typical E3 Electrical Elevations 21 MAGNET ROOM EQUIPMENT ROOM 8 9 TBD TBD 5 4 7 9 9 8 CONTROL ROOM 5 4 3 2 TBD TBD TBD TBD TBD TBD...

Страница 22: ...THE FLOOR NOT TO SCALE Removable coverplate DUCT ON THE WALL Date Rev 24 EN MRI TYP SIGNA_EXPLORER WEB DWG A 03 Aug 2018 SIGNA EXPLORER SIGNA CREATOR Typical E4 Electrical Details 22 CABLE MANAGEMENT...

Страница 23: ...E EMERGENCY OFF BUTTONS ARE SUPPLIED WITH GE MDP OPTION EMERGENCY OFF BUTTONS ARE CUSTOMER SUPPLIED IF GE MDP OPTION NOT USED CIRCUIT BREAKERS ARE PROVIDED FOR PDU CRYO COOLER COMPRESSOR CHILLER GRADI...

Страница 24: ...5 75m 13 94 51 67 ft 17 98 m 59 ft 9 56 m 31 ft 12 5 m 41 ft 12 8m 42 ft 17 4m 57 ft 2 55 16 13m 8 35 52 9 ft 12 2m 40 ft 21 00 m 68 ft 4 3 11 3m 14 1 37 1 ft GOC MAGNET ROOM CONTROL ROOM EQUIPMENT RO...