GE C
OMPANY
D
IRECTION
5472001-1EN, R
EVISION
6
O
PTIMA
CT680 S
ERIES
AND
O
PTIMA
CT670 I
NSTALLATION
M
ANUAL
Page 174
Section 1.0 - Gantry Cover Removal
FAILURE TO DO SO WILL RESULT IN INSTABILITY DURING FRONT COVER
HANDLING.
5.) Insert top post into the base riser post. Align the key for complete engagement.
6.) Insert top post locking pin to secure both top and bottom sections.
7.) Reverse above steps to disassemble.
Note:
For base storage only one (1) palm screw needs to be tightened. This will engage the bottom base
plate and the leg ends preventing the legs from unfolding during transport and storage.
Removal
1.) Position the table at its lowest position.
NOTICE
Always turn OFF the HVDC before the 120 VAC. Turning OFF 120 VAC power before HVDC
power can result in equipment damage.
2.) Remove gantry side and top covers, if you have not already done so.
3.) Verify the three (3) power switches have been turned
OFF
Figure A-10 STC Power Switches
4.) Verify the three (3) power switches have been turned
OFF
Figure A-11 Service Switch Panel
Содержание Optima CT670
Страница 205: ...CT ...
Страница 206: ...206 www gehealthcare com ...