GE C
OMPANY
D
IRECTION
5472001-1EN, R
EVISION
6
O
PTIMA
CT680 S
ERIES
AND
O
PTIMA
CT670 I
NSTALLATION
M
ANUAL
Chapter 1 - Position Subsystems
Page 61
sys
tems
CAUTION
Potential for Injury.
In the ship position, the table tips easily!
DO NOT lean on the table! The shipping bracket should still be in place!
9.) Place the bubble level on the table base. Refer to
Figure 1-37 Level Location on the Table Base
10.) Raise or lower the table as needed using the front and rear levelers and level the table base
in the Z-direction (2 positions) and the Y-direction (1 position).
This process is complete when:
-
The cradle is still centered on the front, mid, and rear marks.
-
The cradle is leveled in the Z-direction at 2 positions shown in
-
The bubble is leveled in the Y direction.
-
The laser is still centered on the wall center line.
-
The table is still on the 26.5" line and the levelers are not resting on the flooring.
-
The laser is the same as in
.
Note:
The leveling process may take several iterations of
through
is required to properly complete this process.
11.) When completed, turn off the laser tool.
Note:
Do not remove the table dollies.
To Gantry
Z-direction
Level Location 2
Z-direction
Level Location 1
Y-direction
Level Location
Содержание Optima CT670
Страница 205: ...CT ...
Страница 206: ...206 www gehealthcare com ...