Testing instructions for KISS™ and KISS™ Multilead
For pump leaks, proceed as described in
“Pump Leakage” on page 22
. If the distributor
leaks, the entire distributor should be replaced (see
Chapter 5 “Spare Parts List
(KISS™/KISS™ Multilead)” on page 41
).
Pump Leakage
Pump Leakage Test with Pumps Requiring Positive Pressure
to Start
Start the pump by blowing against the suction pipe still open and then closing the pipe
with your finger as shown in the test setup (within 3s). Then switch off the negative
pressure pump (ECG recorder or power supply unit): The drop in negative pressure
must not exceed max. 1 mmHg/s (1.33 mbar/s).
If this value is not observed, the pump must be replaced (ECG recorder/acquisition
module (acq. module) or the power supply unit).
If the reading is correct, there must be a leak in the distributor or regulator. The
distributor incl. regulator should be replaced. See
“KISS™ - Disassembly, Assembly” on
page 25
22
KISS™ / KISS™ Multilead
22745010H
Содержание KISS
Страница 14: ...Functional Description 14 KISS KISS Multilead 22745010H ...
Страница 15: ...2 Operating Controls and System Components KISS 22745010H KISS KISS Multilead 15 ...
Страница 18: ...Operating Controls and System Components 18 KISS KISS Multilead 22745010H ...
Страница 36: ...Testing instructions for KISS and KISS Multilead 36 KISS KISS Multilead 22745010H ...
Страница 40: ...Maintenance Cleaning and Troubleshooting KISS KISS Multilead 40 KISS KISS Multilead 22745010H ...
Страница 44: ...Spare Parts List KISS KISS Multilead 44 KISS KISS Multilead 22745010H ...
Страница 52: ...Schematics 52 KISS KISS Multilead 22745010H ...
Страница 53: ......