
Chapter 1 — Installation and Initial Setup
Page
5
•
maintenance kit
(Additional kits are available through G
EI’s Service Department)
•
mixing/workspace plate
• desiccant cartridges (2)
• rubber stopper
• AC power cord
• RS-232 cable
• mating analog output connector
• transportation case
• CD-ROM containing this manual, HCON Humidity Conver-
sion software, and Prostep software
Optional
equipment
•
temperature bath/circulator (for maintaining a stable cham-
ber temperature from 20°C to 30°C)
If an item is missing, contact GE General Eastern. Our phone
number and address are found on page 1.
System diagr
am
Interconnection of the HumiL
ab’s components is shown in
Содержание HumiLab
Страница 43: ...Chapter 5 Maintenance and Troubleshooting Page 39 Figure 13 Mirror Check and Mirror Sensor Balancing Procedure ...
Страница 75: ...Appendix D Humidity Equations and Conversion Charts Page 71 Figure 16 Graphical Conversion Chart ...
Страница 76: ...Page 72 Appendix D Humidity Equations and Conversion Figure 17 Psychrometric Chart ...
Страница 80: ...Page 76 Appendix E Warranty information and return ...