
Chapter 1 — Installation and Initial Setup
Page
7
clean, oil-free gas, regulated at 1 to 2 psig at 5 lpm (minimum).
Connect the dry air or dry nitrogen source using the 1/4”
“instant-on”
DRY AIR IN
connector on the rear of the unit. See
Figure 2 — Humilab rear view (gas, A/C, and signal connections)
Содержание HumiLab
Страница 43: ...Chapter 5 Maintenance and Troubleshooting Page 39 Figure 13 Mirror Check and Mirror Sensor Balancing Procedure ...
Страница 75: ...Appendix D Humidity Equations and Conversion Charts Page 71 Figure 16 Graphical Conversion Chart ...
Страница 76: ...Page 72 Appendix D Humidity Equations and Conversion Figure 17 Psychrometric Chart ...
Страница 80: ...Page 76 Appendix E Warranty information and return ...