User Manual
Chapter 3 Setting Up and Putting Away the System
33
8.
Wrap handset cable around the top of the base unit.
Holding the loop in your hand, wrap the cable clockwise under the first lug. Tuck the
cable under the insertion tube. Hook it around the other lug.
9.
Pack the system into the case.
a.
Verify that no accessories or cords are installed in any of the connectors on the
front panel.
b.
Pack components securely into case so that no parts will be pinched in the lids.
c.
If you have 6-inch or 12-inch rigidizers, insert them into the holes on the back of
the case. The 6-inch rigidizer rests in the groove. The 12-inch rigidizer sticks out
at the bottom end.
d.
Close the lids.
Caution
If you do not pack the system carefully, as described here, damage
might occur.
Lugs
c
a, b
d
Содержание Everest XLG3 VideoProbe
Страница 4: ...iv GE Inspection Technologies XLG3 VideoProbe System ...
Страница 8: ...viii GE Inspection Technologies XLG3 VideoProbe System ...
Страница 34: ...26 Chapter 2 Safe Powering and Grounding GE Inspection Technologies XLG3 VideoProbe System ...
Страница 46: ...38 Chapter 3 Setting Up and Putting Away the System GE Inspection Technologies XLG3 VideoProbe System ...
Страница 54: ...46 Chapter 4 Setting Up the Software GE Inspection Technologies XLG3 VideoProbe System ...
Страница 134: ...126 Chapter 8 Maintenance GE Inspection Technologies XLG3 VideoProbe System ...
Страница 138: ...130 Chapter 9 Troubleshooting GE Inspection Technologies XLG3 VideoProbe System ...
Страница 142: ...134 Appendix A Specifications GE Inspection Technologies XLG3 VideoProbe System ...
Страница 146: ...138 Appendix C Chemical Compatibility GE Inspection Technologies XLG3 VideoProbe System ...
Страница 148: ...140 Appendix D Warranty GE Inspection Technologies XLG3 VideoProbe System ...
Страница 166: ...158 Index GE Inspection Technologies XLG3 VideoProbe System ...