D25
User's Manual
GE Grid Solutions
124
994-0081-3.00-21
GE Information
Shelf Plate,
Continued
Shelf Plate
Location
Each of the three cards on the Shelf Plate is connected to the WESDAC
Board through a DIN connector.
Locking Brackets
Shelf Plate
Field terminations for the Power Supply are made through a five-pin
connector positioned on the back panel of the D25.
Procedure:
Removing the
Shelf Plate
How to remove the shelf plate.
After removing all connections from the IED/RTC and XCOM cards:
Step
Action
1
Locate the two levers that secure the metal Shelf Plate in the D25
housing.
Two labels, one on each side panel inside the enclosure, identify
the Locking Bracket locations.
2
Lift the front end of the locking bracket levers until they click into
the up position.
3
Carefully slide the Shelf Plate and attached cards out of the
housing.
Locking Brackets
Shelf Plate
LIFT LATCH
TO
RELEASE
Содержание D25
Страница 170: ......