Appendix B. Using the Clamping Fixtures
104
PanaFlow™ LC User’s Manual
Figure 89: UCF Setup, Odd Traverse, Step 5
6.
From the other mark on the top of the pipe, measure around the pipe in the opposite direction a
distance equal to 1/4 of the pipe circumference, or the same distance used in Step 5. Use the center
punch to make a mark at this point.
Figure 90: UCF Setup, Odd Traverse, Step 6
7.
Center the long block over one of the center punch marks on the side of the pipe. Align the long block
so that the pressure bolt is directly over the punch mark. Fasten the block to the pipe by wrapping
both chains around the pipe and fastening the chains to the screw hooks on the opposite side of the
block.
Figure 91: UCF Setup, Odd Traverse, Step 7
Содержание Baker Hughes PanaFlow LC XMT1000
Страница 1: ...Flow 910 327 Rev A Sep 2019 bhge com PanaFlow LC User s Manual ...
Страница 2: ......
Страница 4: ...ii no content intended for this page ...
Страница 10: ...Contents viii PanaFlow LC User s Manual ...
Страница 14: ...Preface xii PanaFlow LC User s Manual no content intended for this page ...
Страница 104: ...Chapter 4 Error Codes and Troubleshooting 90 PanaFlow LC User s Manual no content intended for this page ...
Страница 106: ...Chapter 5 Maintenance and Service 92 PanaFlow LC User s Manual no content intended for this page ...
Страница 112: ...Appendix A Specifications and Model Configurations 98 PanaFlow LC User s Manual no content intended for this page ...
Страница 139: ...PanaFlow LC User s Manual 125 Appendix D Modbus Map Appendix D Modbus Map D 1 Input Registers Map ...
Страница 142: ...Appendix E CE Mark Compliance 128 PanaFlow LC User s Manual no content intended for this page ...
Страница 180: ...Appendix H Foundation Fieldbus Communication 166 PanaFlow LC User s Manual no content intended for this page ...
Страница 182: ...Warranty 168 PanaFlow LC User s Manual no content intended for this page ...
Страница 189: ......