Power  Circuit  Breakers Types  AK-2 -15  and  AK-2/3 -2 5  GEI - 50299 

between  them.  See drawing  138B2454  (Figure 

22)  with  the  breaker  restored to service with 

the  ground fault  detector deactivated, establish 

whether  there  is  false  tripping  due  to  over­

current. 

FALSE  TRIPPING  CAUSED  BY FAULTY GROUND 
FAULT DETECTION 

If  the  breaker is  equipped for four wire service 

(fourth  C .T.  remotely  mounted,  Figure  18)  it  is 

important  that  the shielding be effective by having 

continuity  from  the  disconnect  plug  at  the  Power 

Sensor  Unit  to  the  external 

c. 

T. and further,  that 

this  shield be  isolated from the  signal  conductors. 

It 

is  also  important  that continuity  exists through 

the  ground  signal  circuit.  Check these  conditions 

as follows;  referring  to  Figure  22 . 

1.  Remove  connection plug  at  Power Sensor Unit 

and  check continuity  between A  and  C  (Signal). 

Letters  are  located on  end of  plug. 

Figure  18.  (804 1867)  Ground Sensor  Coil 

(Remotely  Located) 

1 .   Terminal 

2.  External Ground Sensor  Coil 

3 .   White Polarity Dot 

2 .   Check  to  be  sure  no  continuity  exists between 

R and 

A, 

or between R and C .  

3 .   Temporarily  connect  jumper  from  shield  to 

either  terminal  at  remote  C .T.  and  check to 

assure  the  shield  is  continuous  from  Power 

Sensor  Plug  to  remote  C. T.  by  checking for 

continuity  between  R  and  A .   If  continuity 

does  not  now  exist,  shield  is  not  continuous 

and point 

of 

discontinuity  must be found.  Check 

the  control  disconnect  as  the  possible  point 

of  discontinuity.  Remove  jumper  at  remote 

C .  T.  after  shield  continuity  is  established. 

Note the polarity  marks on the ground sensors. 

Be  sure  the  external  ground  C .  T.  senses the 

neutral  current  associated with the particular 

breaker  load  current  and that polarity marks 

are  in  accordance with  138B2454  (Figure 22). 

If  the  breaker  bottom  studs  connect  to  the 

source,  the  external  C .T.  must  also have  its 

polarity  mark toward the  source. 

Figure  19 .  (89183 80A)  Control  Disconnect  Plug 

1.  Female Disconnect Plug 

2 .   Terminal  Board 

3. 

Mounting  Bracket 

27 

www 

. ElectricalPartManuals 

. com 

Содержание AK-2A-15

Страница 1: ...nance Instructions Includes Supplement GEI 86153 GEI 50299E Power Circuit Breakers Types AK 2 2A 15 AK 2 3 2A 3A 25 AKU 2 3 2A 3A 25 GENERAL fj ELECTRIC w w w E l e c t r i c a l P a r t M a n u a l s...

Страница 2: ...Cut Off t Jwitch Closing Switch Shunt Trip Device PROTECTIVE DEVICES Overcurrent Trip Device EC 2 Overcurrent Trip Device EC 1 Overcurrent Trip Device Reverse Current Trip Devices Power lensor Trip D...

Страница 3: ...forces the shorter end of the handle upwards against the bottom of the solenoid armature and closes the breaker The breaker may be tripped open by any one of a number of electrical tripping devices w...

Страница 4: ...manual handle cam and mechanism connecting link The Tripping is accomplished by the manual trip button on the escutcheon or by any of the electrical tripping devices available for use on the standard...

Страница 5: ...urrent carrying parts of the breaker and their supporting structure The procedure for this operation is as follows 1 Remove the arc quenchers see section on Arc Quenchers 2 Disconnect the two insulate...

Страница 6: ...lease of tripping latch check mechanism latch adjustment Worn or damaged trip unit parts Replace trip unit Bind in overcurrent trip device Replace overcurrent trip device False Tripping Overcurrent tr...

Страница 7: ...ts and external control circuits They are used only on drawout type breakers A terminal board serves the same purpose on stationary mountedandgeneral purpose enclosure mounted breakers The second ary...

Страница 8: ...e rear side of the stationary contacts Each of the stationary contacts pivot in a horizontal plane approximately at their mid points The end of the contact opposite to the contact tip end is formed in...

Страница 9: ...ontact replacement will call for re placement of all the movable and stationary con tacts at the same time This will be the case where long use of the breaker in service has resulted in extensive wear...

Страница 10: ...r Base 8 Spring REPLACEMENT OF MOVAB LE C ONTACTS 18 Figure 3 1 Coat the pivot area only of the new movable contacts with a thin coat of D50H47 grease 2 Assemble the center pole movable contacts align...

Страница 11: ...hould be adjustable using eccentric numbers 1 2 or 3 These numbers are the ones visible when viewing the breaker from the front not from above The higher numbers should be reserved for tightening at f...

Страница 12: ...function properly it is best to first perform the available remedial measures listed in the Trouble Shooting chart of these instructions One of the remedies 12 listed is that of proper mechanism latch...

Страница 13: ...position where the contacts move before tripping occurs When this position is established note the position of the slot in the head of the adjusting screw 4 Withdraw the adjusting screw three and one...

Страница 14: ...e Arc Quencher 3 Disconnect the two insulated connecting links between the mechanism and the contacts as in step 2 of the procedure for Separation of Front and Back Frames 4 Remove the two elastic sto...

Страница 15: ...bly In replacing the escutcheon it may be necessary to use pliers to pull the operating shaft fully into the escutcheon in order to have space enough to replace the flat washers and the soft retainer...

Страница 16: ...g axis and withdraw it Replace new contacts by reversing the pro cedure slide downward until clear of armature Coil 6 Reassemble with new coil by reversing order of procedure X C ONTACTOR The X contac...

Страница 17: ...s so that enough wire will remain for connection to the new relay Sufficient original wire is allowed for this purpose 2 JL_ lJ L c 3 4 5 After the old relay has been removed the wire leads to the rel...

Страница 18: ...ide also holds a wiring cleat and spacer which serves to hold the wires clear of the link connecting the mechanism andthe breaker position indicator 4 Remove the front escutcheonfrom the breaker 5 Sli...

Страница 19: ...Push Button 1 Nut 2 Frame 3 Spring 4 Rivet 5 Weight 5 Movable Contact 6 Spring 7 Hinge 8 Closing Solenoid _ L _ AUX SW LIC A7 M T C A M2 9 Speed Nut 10 Screw TRIP 3 1 1 Figure 9 695C161 Shunt Trip Dev...

Страница 20: ...ice the movement of the armature may be delayed for a time by a timing device If a relatively long time delay seconds or minutes is desired the velocity of armature movement is governed by a piston mo...

Страница 21: ...shpot Arm 8 Connecting Link 9 Instantaneous Pickup Calibration Marks counter clockwise motion decreases it The dash pot arm 7 Figure 1 1 is indexed at four points maximum 2 3 1 3 minimum from the left...

Страница 22: ...instantaneous pick up value may have one of the following three ranges 4 to 9 times coil rating 6 to 12 times coil rating or 9 to 15 times coil rating The pick up setting may be varied by turning the...

Страница 23: ...overcurrent trip devices have been replaced Positive tripping is achieved when adjustment screw 2 Figure 10 is in such a position that it will always carry the trip paddle on the trip shaft beyond the...

Страница 24: ...against trip paddle 14 tripping thebreaker open ADJUSTMENTS The only adjustment to be made on the reverse current device is to make sure that the trip rod has a minimum overtravel of 1 32 of an inch...

Страница 25: ...nciple that the instantaneous value of current flowing in the three conductors or in four conductors on four wire systems must add to zero unless ground current is flowing Therefore if the electrical...

Страница 26: ...Power Sensor Successful operations in the test position should be ob tained before proceedingwith the Power Sensor trouble shooting 3 A PST 1 Power Sensor Test Kit must be available Figure 21 Check t...

Страница 27: ...Coil Remotely Located 1 Terminal 2 External Ground Sensor Coil 3 White Polarity Dot 2 Check to be sure no continuity exists between R and A or between R and C 3 Temporarily connect jumper from shield...

Страница 28: ...ngle phase testing unless the signal is shorted at the terminal board Figure 22 Jumper points 1 and 5 during overcurrent test The above considerations shouldindicate which of the four major components...

Страница 29: ...C CONTtt ii IT R TO IEt O 1 tE tJi AL c 5RDUNO SEN SO COi l n n 75 11 Jt 50U R C E T P I C L f 0 JtJD F A JLT Co i E TiON eREAK E i 1 C t l 1 G eOuiJD SENSO OiSCO t4 IE i A NC ttlC T R NAl Gi OUNO 5SN...

Страница 30: ...NGE AVA IL ABLE PER D E V ICE R A N G E OF 6 TO 12 T IMES IS F U RNISHED U N L E S S 1 f fi H I I I I I I O T H E RW I S E SPECIFI E D S E T T I NGIS ARE AT 12 T IM E S RATING r TOTA L cURVES ARE P L...

Страница 31: ...TIIP liniNG Figure 25 109HL689 Time Curve 5 Unsolder three leads at ground disconnect and pull wire through hole in back frame On stationary breakers withfourthwire ground disconnect unsolder leads at...

Страница 32: ...o wiring diagram 0102C3698 Figure 26 The voltage 208V AC or 230V AC to be monitored is connected to terminals 1 and 2 of the time delay box The undervoltage device 32 R T t C o N NE c T tr o c T O ME...

Страница 33: ...unit is the faulty component A B Check input voltages across terminals 1 2 on static box These voltages should be as follows 1 Device 177L3 16 G 12 208 or 230volts A C 2 Device 177L316 G 14 125 volts...

Страница 34: ...y device and its construction is similar The adjustments and replacement of t is device are the same as those described above for the static time delay undervoltage device UNDERVOLTAGE LOCKOUT DEVICE...

Страница 35: ...eaker opens lever 2 rotates counterclockwise about pin 14 The motion is transmitted through links 1 and 13 to paddle 12 which operates bell alarm switch 11 If the device has the lockout feature the mo...

Страница 36: ...wn to engage the trip shaft paddle in the tripped position 1 Figure 31 8041865 Open Fuse Lockout Device 1 Mounting Holes 2 Lever 3 Reset Button 4 Collor 5 Armature 6 Coil 36 4 2 Check that each armatu...

Страница 37: ...embly of the existing backframe with the new front frame Addition of Shunt Trip Device Auxiliary witch Undervoltage Device Bell Alarm Lockout Device Drawout Mechanism Conversion to Elec Oper Covered B...

Страница 38: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 39: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 40: ...further information call or write your local General Electric Sales Office or Distribution Equipment Division 41 Woodford Avenue Plainville CT 06062 USA GENERAL fl ELECTRIC w w w E l e c t r i c a l P...

Отзывы: