background image

• 

.. 

Power Circuit  Breakers Types  AK-2 -15  and AK-2/3-25  GEI -50299 

alternate  breaker  presents  a  convenient  method 

of mechanically  interlocking two or  more breakers 

to  assure  that  no  two  breakers  may  be closed at 

the  same time. 

BELL ALARM SWITCH 

LOCKOUT  ATTACHMENTS 

(Figure  30) 

The  bell  alarm  device  is  mounted  on  top  of 

the  horizontal  cross  frame  member  just  to  the 

left  of  the  mechanism  frame  when  the  breaker 

is  viewed  from  the  front.  This  device  operates 

a  switch  with  two  sets  of  contacts,  one  normally 

open,  the  other  normally  closed.  The  switch  may 

be  used  to  open  or  close  an  external  circuit, 

giving  a  bell  or  light  indication  of  a  protective 

trip  device  operation. 

If 

the  breaker  is  tripped  open  by  any  means 

other  than  the  manual  trip  button  or  the  shunt 

trip  device,  the  bell  alarm  mechatiism is activated. 

The  alarm  is  shut  off  and  the  bell  alarm and 

lockout  mechanism  is  reset  by  operation  of  the 

manual  trip  button  or  shunt  trip  device. 

If 

the 

device  is  a  bell  alarm  only,  the  bell  alarm  mech­

anism is  also reset simply by  closing the breaker. 

OPERATION 

Lever  (2)  is  connected  to  the  breaker  mech­

anism  so  that  when  the  breaker  opens  lever  (2) 

rotates  counterclockwise  about  pin  (14). 

The 

motion  is  transmitted  through  links  ( 1 )   and  (13) 

to  paddle  (12)  which  operates  bell  alarm  switch 

( 1 1 } .  

If 

the  device  has  the  lockout  feature, the 

movement  of  link  (13)  also  causes  lockout  link 

(8)  to  slide  in  a  direction  that  results  in  its 

striking  trip  paddle  '5)  which,  by  displacement  of 

the  breaker  mechanism  trip  latch,  makes  it  im­

possible  to  reset  the  breaker  mechanism  until 

the  bell  alarm  mechanism  is  reset. 

Link  (6)  serves  as  a  latch  in  the  bell alarm 

mechanism. 

If 

it is  displaced,  link  (10)  is  free 

to  rotate  about  its  lower  pin.  This  deprives  the 

linkage  of  its  normally  fixed  center  of  rotation 

about  pin  (15)  and  defeats both the  bell  alarm  and 

the  lockout  operation. 

Operation  of  either  the 

manual  trip  button  or  the  shunt  trip  device  will 

displace  latch  (6)  and  have  this  effect.  Thus 

if 

the  breaker  is  tripped  by  either  of  these  means, 

the  bell  alarm  and/or  lockout  will  not  operate. 

Also,  operation  of  either  of  these  devices  will 

reset the  switch and inactivate the  lockout. 

TYPICAL  CONNECTION 

DIAGRA M 

Figure  30.  (695C1 58)  Bell  Alarm  anrl  Lockout  Device 

1 .   Link 

2 .   Lever 

3.  Pin 

4.  Trip  Shaft 

5 .   Trip  Paddle 

6. 

Link 

7.  Trip  Arm 

8. 

Lockout  Link 

9. 

Frame 

10. 

Link 

1 1 .   Switch 

12 .  Paddle 

13.  Link 

14.  Pin 

1 5.  Pin 

1 6.  Springs 

1 7 .   Spring 

3 5  

www 

. ElectricalPartManuals 

. com 

Содержание AK-2A-15

Страница 1: ...nance Instructions Includes Supplement GEI 86153 GEI 50299E Power Circuit Breakers Types AK 2 2A 15 AK 2 3 2A 3A 25 AKU 2 3 2A 3A 25 GENERAL fj ELECTRIC w w w E l e c t r i c a l P a r t M a n u a l s...

Страница 2: ...Cut Off t Jwitch Closing Switch Shunt Trip Device PROTECTIVE DEVICES Overcurrent Trip Device EC 2 Overcurrent Trip Device EC 1 Overcurrent Trip Device Reverse Current Trip Devices Power lensor Trip D...

Страница 3: ...forces the shorter end of the handle upwards against the bottom of the solenoid armature and closes the breaker The breaker may be tripped open by any one of a number of electrical tripping devices w...

Страница 4: ...manual handle cam and mechanism connecting link The Tripping is accomplished by the manual trip button on the escutcheon or by any of the electrical tripping devices available for use on the standard...

Страница 5: ...urrent carrying parts of the breaker and their supporting structure The procedure for this operation is as follows 1 Remove the arc quenchers see section on Arc Quenchers 2 Disconnect the two insulate...

Страница 6: ...lease of tripping latch check mechanism latch adjustment Worn or damaged trip unit parts Replace trip unit Bind in overcurrent trip device Replace overcurrent trip device False Tripping Overcurrent tr...

Страница 7: ...ts and external control circuits They are used only on drawout type breakers A terminal board serves the same purpose on stationary mountedandgeneral purpose enclosure mounted breakers The second ary...

Страница 8: ...e rear side of the stationary contacts Each of the stationary contacts pivot in a horizontal plane approximately at their mid points The end of the contact opposite to the contact tip end is formed in...

Страница 9: ...ontact replacement will call for re placement of all the movable and stationary con tacts at the same time This will be the case where long use of the breaker in service has resulted in extensive wear...

Страница 10: ...r Base 8 Spring REPLACEMENT OF MOVAB LE C ONTACTS 18 Figure 3 1 Coat the pivot area only of the new movable contacts with a thin coat of D50H47 grease 2 Assemble the center pole movable contacts align...

Страница 11: ...hould be adjustable using eccentric numbers 1 2 or 3 These numbers are the ones visible when viewing the breaker from the front not from above The higher numbers should be reserved for tightening at f...

Страница 12: ...function properly it is best to first perform the available remedial measures listed in the Trouble Shooting chart of these instructions One of the remedies 12 listed is that of proper mechanism latch...

Страница 13: ...position where the contacts move before tripping occurs When this position is established note the position of the slot in the head of the adjusting screw 4 Withdraw the adjusting screw three and one...

Страница 14: ...e Arc Quencher 3 Disconnect the two insulated connecting links between the mechanism and the contacts as in step 2 of the procedure for Separation of Front and Back Frames 4 Remove the two elastic sto...

Страница 15: ...bly In replacing the escutcheon it may be necessary to use pliers to pull the operating shaft fully into the escutcheon in order to have space enough to replace the flat washers and the soft retainer...

Страница 16: ...g axis and withdraw it Replace new contacts by reversing the pro cedure slide downward until clear of armature Coil 6 Reassemble with new coil by reversing order of procedure X C ONTACTOR The X contac...

Страница 17: ...s so that enough wire will remain for connection to the new relay Sufficient original wire is allowed for this purpose 2 JL_ lJ L c 3 4 5 After the old relay has been removed the wire leads to the rel...

Страница 18: ...ide also holds a wiring cleat and spacer which serves to hold the wires clear of the link connecting the mechanism andthe breaker position indicator 4 Remove the front escutcheonfrom the breaker 5 Sli...

Страница 19: ...Push Button 1 Nut 2 Frame 3 Spring 4 Rivet 5 Weight 5 Movable Contact 6 Spring 7 Hinge 8 Closing Solenoid _ L _ AUX SW LIC A7 M T C A M2 9 Speed Nut 10 Screw TRIP 3 1 1 Figure 9 695C161 Shunt Trip Dev...

Страница 20: ...ice the movement of the armature may be delayed for a time by a timing device If a relatively long time delay seconds or minutes is desired the velocity of armature movement is governed by a piston mo...

Страница 21: ...shpot Arm 8 Connecting Link 9 Instantaneous Pickup Calibration Marks counter clockwise motion decreases it The dash pot arm 7 Figure 1 1 is indexed at four points maximum 2 3 1 3 minimum from the left...

Страница 22: ...instantaneous pick up value may have one of the following three ranges 4 to 9 times coil rating 6 to 12 times coil rating or 9 to 15 times coil rating The pick up setting may be varied by turning the...

Страница 23: ...overcurrent trip devices have been replaced Positive tripping is achieved when adjustment screw 2 Figure 10 is in such a position that it will always carry the trip paddle on the trip shaft beyond the...

Страница 24: ...against trip paddle 14 tripping thebreaker open ADJUSTMENTS The only adjustment to be made on the reverse current device is to make sure that the trip rod has a minimum overtravel of 1 32 of an inch...

Страница 25: ...nciple that the instantaneous value of current flowing in the three conductors or in four conductors on four wire systems must add to zero unless ground current is flowing Therefore if the electrical...

Страница 26: ...Power Sensor Successful operations in the test position should be ob tained before proceedingwith the Power Sensor trouble shooting 3 A PST 1 Power Sensor Test Kit must be available Figure 21 Check t...

Страница 27: ...Coil Remotely Located 1 Terminal 2 External Ground Sensor Coil 3 White Polarity Dot 2 Check to be sure no continuity exists between R and A or between R and C 3 Temporarily connect jumper from shield...

Страница 28: ...ngle phase testing unless the signal is shorted at the terminal board Figure 22 Jumper points 1 and 5 during overcurrent test The above considerations shouldindicate which of the four major components...

Страница 29: ...C CONTtt ii IT R TO IEt O 1 tE tJi AL c 5RDUNO SEN SO COi l n n 75 11 Jt 50U R C E T P I C L f 0 JtJD F A JLT Co i E TiON eREAK E i 1 C t l 1 G eOuiJD SENSO OiSCO t4 IE i A NC ttlC T R NAl Gi OUNO 5SN...

Страница 30: ...NGE AVA IL ABLE PER D E V ICE R A N G E OF 6 TO 12 T IMES IS F U RNISHED U N L E S S 1 f fi H I I I I I I O T H E RW I S E SPECIFI E D S E T T I NGIS ARE AT 12 T IM E S RATING r TOTA L cURVES ARE P L...

Страница 31: ...TIIP liniNG Figure 25 109HL689 Time Curve 5 Unsolder three leads at ground disconnect and pull wire through hole in back frame On stationary breakers withfourthwire ground disconnect unsolder leads at...

Страница 32: ...o wiring diagram 0102C3698 Figure 26 The voltage 208V AC or 230V AC to be monitored is connected to terminals 1 and 2 of the time delay box The undervoltage device 32 R T t C o N NE c T tr o c T O ME...

Страница 33: ...unit is the faulty component A B Check input voltages across terminals 1 2 on static box These voltages should be as follows 1 Device 177L3 16 G 12 208 or 230volts A C 2 Device 177L316 G 14 125 volts...

Страница 34: ...y device and its construction is similar The adjustments and replacement of t is device are the same as those described above for the static time delay undervoltage device UNDERVOLTAGE LOCKOUT DEVICE...

Страница 35: ...eaker opens lever 2 rotates counterclockwise about pin 14 The motion is transmitted through links 1 and 13 to paddle 12 which operates bell alarm switch 11 If the device has the lockout feature the mo...

Страница 36: ...wn to engage the trip shaft paddle in the tripped position 1 Figure 31 8041865 Open Fuse Lockout Device 1 Mounting Holes 2 Lever 3 Reset Button 4 Collor 5 Armature 6 Coil 36 4 2 Check that each armatu...

Страница 37: ...embly of the existing backframe with the new front frame Addition of Shunt Trip Device Auxiliary witch Undervoltage Device Bell Alarm Lockout Device Drawout Mechanism Conversion to Elec Oper Covered B...

Страница 38: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 39: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 40: ...further information call or write your local General Electric Sales Office or Distribution Equipment Division 41 Woodford Avenue Plainville CT 06062 USA GENERAL fl ELECTRIC w w w E l e c t r i c a l P...