10 Installation
P50 Agile P153
10-4
P153/EN M/B
2
INSTALLATION
2.1
Handling the Goods
Our products are of robust construction but require careful treatment before installation on site. This
section discusses the requirements for receiving and unpacking the goods, as well as associated
considerations regarding product care and personal safety.
Caution: Before lifting or moving the equipment you should be familiar with
the Safety Information chapter of this manual.
2.1.1
Receipt of the Goods
On receipt, ensure the correct product has been delivered. Unpack the product immediately to ensure
there has been no external damage in transit. If the product has been damaged, make a claim to the
transport contractor and notify us promptly.
For products not intended for immediate installation, repack them in their original delivery packaging.
2.1.2
Unpacking the Goods
When unpacking and installing the product, take care not to damage any of the parts and make sure
that additional components are not accidentally left in the packing or lost. Do not discard any
CDROMs or technical documentation. These should accompany the unit to its destination substation
and put in a dedicated place.
The site should be well lit to aid inspection, clean, dry and reasonably free from dust and excessive
vibration. This particularly applies where installation is being carried out at the same time as
construction work.
2.1.3
Storing the Goods
If the unit is not installed immediately, store it in a place free from dust and moisture in its original
packaging. Keep any de-humidifier bags included in the packing. The de-humidifier crystals lose their
efficiency if the bag is exposed to ambient conditions. Restore the crystals before replacing it in the
carton. Bags should be placed on flat racks and spaced to allow circulation around them. The time
taken for regeneration will depend on the size of the bag. If a ventilating, circulating oven is not
available, when using an ordinary oven, open the door on a regular basis to let out the steam given off
by the regenerating silica gel. On subsequent unpacking, make sure that any dust on the carton does
not fall inside. Avoid storing in locations of high humidity. In locations of high humidity the packaging
may become impregnated with moisture and the de-humidifier crystals will lose their efficiency.
The device can be stored between –25º to +70ºC.
2.1.4
Dismantling the Goods
If you need to dismantle the device, always observe standard ESD (Electrostatic Discharge)
precautions.
The minimum precautions to be followed are as follows:
•
Use an antistatic wrist band earthed to a suitable earthing point.
•
Avoid touching the electronic components and PCBs.
Содержание Agile P50 Series
Страница 3: ...P50 Agile P153 1 Introduction P153 EN M B 1 1 INTRODUCTION CHAPTER 1...
Страница 4: ...1 Introduction P50 Agile P153 1 2 P153 EN M B...
Страница 10: ...1 Introduction P50 Agile P153 1 8 P153 EN M B...
Страница 11: ...P50 Agile P153 2 Safety Information P153 EN M A 2 1 SAFETY INFORMATION CHAPTER 2...
Страница 22: ...Chapter 2 Safety Information P50 Agile P153 2 12 P153 EN M A...
Страница 23: ...P50 Agile P153 3 Hardware Design P153 EN M B 3 1 HARDWARE DESIGN CHAPTER 3...
Страница 24: ...3 Hardware Design P50 Agile P153 3 2 P153 EN M B...
Страница 32: ...3 Hardware Design P50 Agile P153 3 10 P153 EN M B...
Страница 33: ...P50 Agile P153 4 Front Panel P153 EN M B 4 1 FRONT PANEL CHAPTER 4...
Страница 34: ...4 Front Panel P50 Agile P153 4 2 P153 EN M B...
Страница 39: ...P50 Agile P153 5 Configuration P153 EN M B 5 1 CONFIGURATION CHAPTER 5...
Страница 40: ...P50 Agile P153 5 Configuration P153 EN M B 5 2...
Страница 150: ...P50 Agile P153 5 Configuration P153 EN M B 5 112...
Страница 151: ...P50 Agile P153 6 Protection Functions P153 EN M B 6 1 PROTECTION FUNCTIONS CHAPTER 6...
Страница 152: ...6 Protection Functions P50 Agile P153 6 2 P153 EN M B...
Страница 167: ...P50 Agile P153 7 Protection Parameter Settings P153 EN M B 7 1 PROTECTION PARAMETER SETTINGS CHAPTER 7...
Страница 168: ...7 Protection Parameter Settings P50 Agile P153 7 2 P153 EN M B...
Страница 189: ...P50 Agile P153 8 Monitoring Control P153 EN M B 8 1 MONITORING CONTROL CHAPTER 8...
Страница 190: ...8 Monitoring Control P50 Agile P153 8 2 P153 EN M B...
Страница 207: ...P50 Agile P153 9 SCADA Communications P153 EN M B 9 1 SCADA COMMUNICATIONS CHAPTER 9...
Страница 208: ...12 SCADA Communications P50 Agile P153 9 2 P153 EN M B...
Страница 220: ...12 SCADA Communications P50 Agile P153 9 14 P153 EN M B...
Страница 221: ...P50 Agile P153 10 Installation P153 EN M B 10 1 INSTALLATION CHAPTER 10...
Страница 222: ...10 Installation P50 Agile P153 10 2 P153 EN M B...
Страница 232: ...10 Installation P50 Agile P153 10 12 P153 EN M B 2 4 Case dimensions Figure 10 Case dimensions Note All dimensions in mm...
Страница 233: ...P50 Agile P153 13 Commissioning Instructions P153 EN M B 13 1 COMMISSIONING INSTRUCTIONS CHAPTER 11...
Страница 234: ...13 Commissioning Instructions P50 Agile P153 13 2 P153 EN M B...
Страница 241: ...P50 Agile P153 12 Maintenance and Troubleshooting P153 EN M B 12 1 MAINTENANCE AND TROUBLESHOOTING CHAPTER 12...
Страница 242: ...12 Maintenance and Troubleshooting P50 Agile P153 12 2 P153 EN M B...
Страница 250: ...12 Maintenance and Troubleshooting P50 Agile P153 12 10 P153 EN M B...
Страница 251: ...P50 Agile P153 13 Technical Specifications P153 EN M B 13 1 TECHNICAL SPECIFICATIONS CHAPTER 13...
Страница 252: ...13 Technical Specifications P50 Agile P153 13 2 P153 EN M B...
Страница 263: ...P50 Agile P153 14 Wiring Diagrams P153 EN M B 14 1 WIRING DIAGRAMS CHAPTER 14...
Страница 264: ...14 Wiring Diagrams P50 Agile P153 14 2 P153 EN M B...
Страница 266: ...14 Wiring Diagrams P50 Agile P153 14 4 P153 EN M B 2 WIRING DIAGRAM Figure 1 P153 wiring diagram...
Страница 267: ......