7 Protection Parameter Settings
P50 Agile P153
7-18
P153/EN M/B
Sr. No
Parameter
Default setting
Setting Range
19.
IN1>1 Current Set
0.20*In
0.05 to 4.00 step 0.01*In
This setting determines the new pick-up setting for first stage earth fault element during the tclp time delay.
20.
IN1>1 Time Delay
0.01 S
0s to 200s step 0.01s
This setting determines the new operating time delay for the first stage definite time element during the tclp time.
21.
IN1>1 TMS
0.100
0.025 to 1.2 step 0.005
This setting determines the new time multiplier setting to adjust the operating time of the IEC IDMT characteristic during the tclp time.
22.
IN1>1 Time Dial
1
0.01 to 100 step 0.01
This setting determines the new time multiplier setting for the first stage measured earth fault element to adjust the operating time of the
IEEE / US IDMT characteristic during the tclp time.
23.
IN1>2 Status
Enabled
Blocked / Enabled
The IN1>2 status cells have two setting options, "Enabled" and "Blocked". Selecting "Enabled" for a particular stage means that the
current and time settings programmed in the following cells will be adopted during the "tclp" time. Selecting of "Blocked" simply blocks the
relevant protection stage during the "tclp" time. It also removes the following current and time settings for that stage from the menu.
24.
IN1>2 Current Set
0.20*In
0.05 to 4.00*In step 0.01*In
This setting determines the new pick-up setting for second stage earth fault element during the tclp time delay.
25.
IN1>2 Time Delay
0.01 S
0s to 200s step 0.01s
This setting determines the new operating time delay for the second stage definite time element during the tclp time.
26.
IN1>2 TMS
0.100
0.025 to 1.2 step 0.005
This setting determines the new time multiplier setting to adjust the operating time of the IEC / UK IDMT characteristic during the tclp time.
27.
IN1>2 Time Dial
1
0.01 to 100 step 0.01
This setting determines the new time multiplier setting for the second stage measured earth fault element to adjust the operating time of
the IEEE / US IDMT characteristic during the tclp time.
28.
IN1>3 Status
Enabled
Blocked / Enabled
The IN1>3 status cells have two setting options, "Enabled" and "Blocked". Selecting "Enabled" for a particular stage means that the
current and time settings programmed in the following cells will be adopted during the "tclp" time. Selecting "Blocked" simply blocks the
relevant protection stage during the "tclp" time. It also removes the following current and time settings for that stage from the menu.
29.
IN1>3 Current Set
0.20*In
0.05 to 4.00*In step 0.01*In
This setting determines the new pick-up setting for third stage earth fault element during the tclp time delay.
30.
IN1>3 Time Delay
0.01 S
0s to 200s step 0.01s
This setting determines the new operating time delay for the third stage definite time element during the tclp time.
31.
IN1>3 TMS
0.100
0.025 to 1.2 step 0.005
This setting determines the new time multiplier setting to adjust the operating time of the IEC / UK IDMT characteristic during the tclp time.
32.
IN1>3 Time Dial
1
0.01 to 100 step 0.01
This setting determines the new time multiplier setting for the third stage measured earth fault element to adjust the operating time of the
IEEE / US IDMT characteristic during the tclp time.
33.
IN2>1 Status
Enabled
Blocked / Enabled
The IN2>1 status cells have two setting options, "Enabled" and "Blocked". Selecting "Enabled" for a particular stage means that the
current and time settings programmed in the following cells will be adopted during the "tclp" time. Selecting "Blocked" simply blocks the
relevant protection stage during the "tclp" time. It also removes the following current and time settings for that stage from the menu.
34.
IN2>1 Current Set
0.20*In
0.10 to 4.00 step 0.01*In
This setting determines the new pick-up setting for first stage earth fault element during the tclp time delay.
35.
IN2>1 Time Delay
0.01 S
0s to 200s step 0.01s
This setting determines the new operating time delay for the first stage definite time element during the tclp time.
36.
IN2>1 TMS
0.100
0.025 to 1.2 step 0.005
This setting determines the new time multiplier setting to adjust the operating time of the IEC IDMT characteristic during the tclp time.
37.
IN2>1 Time Dial
1
0.01 to 100 step 0.01
Содержание Agile P50 Series
Страница 3: ...P50 Agile P153 1 Introduction P153 EN M B 1 1 INTRODUCTION CHAPTER 1...
Страница 4: ...1 Introduction P50 Agile P153 1 2 P153 EN M B...
Страница 10: ...1 Introduction P50 Agile P153 1 8 P153 EN M B...
Страница 11: ...P50 Agile P153 2 Safety Information P153 EN M A 2 1 SAFETY INFORMATION CHAPTER 2...
Страница 22: ...Chapter 2 Safety Information P50 Agile P153 2 12 P153 EN M A...
Страница 23: ...P50 Agile P153 3 Hardware Design P153 EN M B 3 1 HARDWARE DESIGN CHAPTER 3...
Страница 24: ...3 Hardware Design P50 Agile P153 3 2 P153 EN M B...
Страница 32: ...3 Hardware Design P50 Agile P153 3 10 P153 EN M B...
Страница 33: ...P50 Agile P153 4 Front Panel P153 EN M B 4 1 FRONT PANEL CHAPTER 4...
Страница 34: ...4 Front Panel P50 Agile P153 4 2 P153 EN M B...
Страница 39: ...P50 Agile P153 5 Configuration P153 EN M B 5 1 CONFIGURATION CHAPTER 5...
Страница 40: ...P50 Agile P153 5 Configuration P153 EN M B 5 2...
Страница 150: ...P50 Agile P153 5 Configuration P153 EN M B 5 112...
Страница 151: ...P50 Agile P153 6 Protection Functions P153 EN M B 6 1 PROTECTION FUNCTIONS CHAPTER 6...
Страница 152: ...6 Protection Functions P50 Agile P153 6 2 P153 EN M B...
Страница 167: ...P50 Agile P153 7 Protection Parameter Settings P153 EN M B 7 1 PROTECTION PARAMETER SETTINGS CHAPTER 7...
Страница 168: ...7 Protection Parameter Settings P50 Agile P153 7 2 P153 EN M B...
Страница 189: ...P50 Agile P153 8 Monitoring Control P153 EN M B 8 1 MONITORING CONTROL CHAPTER 8...
Страница 190: ...8 Monitoring Control P50 Agile P153 8 2 P153 EN M B...
Страница 207: ...P50 Agile P153 9 SCADA Communications P153 EN M B 9 1 SCADA COMMUNICATIONS CHAPTER 9...
Страница 208: ...12 SCADA Communications P50 Agile P153 9 2 P153 EN M B...
Страница 220: ...12 SCADA Communications P50 Agile P153 9 14 P153 EN M B...
Страница 221: ...P50 Agile P153 10 Installation P153 EN M B 10 1 INSTALLATION CHAPTER 10...
Страница 222: ...10 Installation P50 Agile P153 10 2 P153 EN M B...
Страница 232: ...10 Installation P50 Agile P153 10 12 P153 EN M B 2 4 Case dimensions Figure 10 Case dimensions Note All dimensions in mm...
Страница 233: ...P50 Agile P153 13 Commissioning Instructions P153 EN M B 13 1 COMMISSIONING INSTRUCTIONS CHAPTER 11...
Страница 234: ...13 Commissioning Instructions P50 Agile P153 13 2 P153 EN M B...
Страница 241: ...P50 Agile P153 12 Maintenance and Troubleshooting P153 EN M B 12 1 MAINTENANCE AND TROUBLESHOOTING CHAPTER 12...
Страница 242: ...12 Maintenance and Troubleshooting P50 Agile P153 12 2 P153 EN M B...
Страница 250: ...12 Maintenance and Troubleshooting P50 Agile P153 12 10 P153 EN M B...
Страница 251: ...P50 Agile P153 13 Technical Specifications P153 EN M B 13 1 TECHNICAL SPECIFICATIONS CHAPTER 13...
Страница 252: ...13 Technical Specifications P50 Agile P153 13 2 P153 EN M B...
Страница 263: ...P50 Agile P153 14 Wiring Diagrams P153 EN M B 14 1 WIRING DIAGRAMS CHAPTER 14...
Страница 264: ...14 Wiring Diagrams P50 Agile P153 14 2 P153 EN M B...
Страница 266: ...14 Wiring Diagrams P50 Agile P153 14 4 P153 EN M B 2 WIRING DIAGRAM Figure 1 P153 wiring diagram...
Страница 267: ......