GE
RAFT
V
OLUSON
™ P8 / V
OLUSON
™ P6
DIRECTION 5723243, R
EVISION
6
DRAFT (M
AY
23, 2018)
B
ASIC
S
ERVICE
M
ANUAL
8-110
Section 8-33 - Replacement of the Trackball
2.) Connect the cable to the connector on the main PWA and screw the trackball with 2 screws. Refer
to the figure below.
NOTE:
Please check the position of the label as the below figure to connect in the right position.
3.) Install the OPIO ASSY like as reverse order of removal procedure from step 4) of
Figure 8-163 Connecting the cable to the connector and screwing the trackball
CP : Main PWA side
Ball : Trackball side