20
Figure 22
7
、
End of work
1. Close all valves on the cylinder.
2. Press the "bleed" button on the panel to discharge the residual gas in the
pipeline.
Note: do not pull off the air inlet plug without venting
3. Turn off the power.
4. Pull out the air pipe.
5. Unplug the signal and power cables.
8
、
Precautions
1. When verifying the SF6 gas density relay on site, disconnect the power
supply connected with the density relay to avoid damaging the calibrator.
2. Before going to the site, bring the tool box, check the nitrogen gas storage
capacity of the small gas cylinder in the tool box, and bring all the transition
joints and tools for the switch.
3. The corresponding alarm signal line and locking signal line on the terminal
strip shall be disconnected from the terminal strip to prevent the secondary
circuit and the signal line in the secondary circuit from forming a circuit and
affecting the test.