B-2
Appendix B, Page B-2
Ventilator Start-Up Inspection And Tests - cont.
____ Hot water lines from the Wash Control Cabinet to the Ventilator(s) are connected and operational.
____ Ventilators built in multiple sections the hot water interconnections between sections are complete.
____ All drain(s) are plumbed to the floor sink or other drain.
____ Fire Extinguishing System installed and certified.
____ All Gaylord XGS Extractors are installed in the Ventilator(s).
For ELXC-UVi Series Ventilators
____ There is a 208–250 VAC, 50/60HZ, Single Phase, 20AMP circuit going to the Ballast Box on the top of
each individual Ventilator section. One power source will serve a two section Ventilator.
____ If the Ventilator is built in two sections, the interconnection of the two UV Ballast Boxes is complete.
Содержание ELXC Series
Страница 40: ...4 6 INTENTIONALLY LEFT BLANK ...
Страница 74: ...7 1 Chapter 7 Wiring Diagrams ELXC GBD with AUTOSTART ...
Страница 75: ...7 2 Chapter 7 Wiring Diagrams ELXC GFBD with AUTOSTART ...
Страница 76: ...7 3 Chapter 7 Wiring Diagrams ELXC GBD UVi with AUTOSTART ...
Страница 77: ...7 4 Chapter 7 Wiring Diagrams ELXC GFBD UVi with AUTOSTART ...
Страница 82: ...A 5 Appendix A Page A 5 Installation Requirements cont Figure A 5 1 Typical Installation MAIN FEED PIPE ...
Страница 83: ...A 6 INTENTIONALLY LEFT BLANK ...