42
www.gateway.com
Chapter 4: Installing Components
Opening the server case
Because the components inside your server are extremely sensitive to static electricity, make
sure that you follow the instructions at the beginning of this chapter to avoid static
electricity damage.
To open the server case:
1
Follow the instructions in
“Preventing static electricity discharge” on page 41
2
Turn off the server, then unplug the power cords and all other cables connected to
the server.
3
For more stability, place the server on its side.
4
If the shipping screw is installed, remove it.
Caution
For correct cooling and air flow, always reinstall the side panel and
the air duct (if included) before you turn on the server. Operating the
server without the cover in place can damage server components.
Warning
This server may have two power cords. To disconnect internal
AC power, you must unplug both power cords.
Shipping
screw
Release
latch
8510725.book Page 42 Tuesday, May 17, 2005 5:45 PM
Содержание 9510
Страница 1: ...Gateway 9510 Server User Guide ...
Страница 15: ...10 www gateway com Chapter 1 Checking Out Your Gateway Server 8510725 book Page 10 Tuesday May 17 2005 5 45 PM ...
Страница 29: ...24 www gateway com Chapter 2 Setting Up Your Server 8510725 book Page 24 Tuesday May 17 2005 5 45 PM ...
Страница 149: ...144 www gateway com Chapter 6 Configuring your RAID solutions 8510725 book Page 144 Tuesday May 17 2005 5 45 PM ...
Страница 175: ...170 www gateway com Chapter 7 Troubleshooting 8510725 book Page 170 Tuesday May 17 2005 5 45 PM ...
Страница 187: ...182 www gateway com Appendix A 8510725 book Page 182 Tuesday May 17 2005 5 45 PM ...
Страница 213: ...208 www gateway com Appendix C 8510725 book Page 208 Tuesday May 17 2005 5 45 PM ...
Страница 221: ...216 www gateway com 8510725 book Page 216 Tuesday May 17 2005 5 45 PM ...
Страница 222: ...A MAN 9510 USR GDE R1 04 05 ...