
14
Chapter 2: Setup and Installation
www.gateway.com
The installation is divided into three sections:
■
The first section describes installing the enclosure into the rack cabinet.
See “Enclosure detailed installation” on page 15.
■
The second section describes setting the SAF-TE Disk I/O card switches and
the enclosure-to-enclosure cabling. The SAF-TE card switch settings
determine the SCSI IDs, RAID Addressing, and disk spin-up options. See
“Enclosure configuration” on page 21.
■
The third section describes the cabling of the enclosure to the host
system(s). This enclosure is very flexible and there are several possible
configurations. See “Host cabling” on page 28.
Содержание 850
Страница 1: ...user sguide your Gateway 850 SCSI storage enclosure Installing Configuring...
Страница 2: ......
Страница 34: ...30 Chapter 2 Setup and Installation www gateway com...
Страница 50: ...46 Chapter 3 Monitoring Systems www gateway com...
Страница 64: ...60 Chapter 4 Troubleshooting www gateway com...
Страница 65: ...5 61 Maintenance In this chapter you will find the maintenance procedures to replace enclosure components...
Страница 76: ...72 Chapter 5 Maintenance www gateway com...
Страница 77: ...A 73 Technical Information Specifications...
Страница 84: ...80 Appendix C Safety Regulatory and Legal Information www gateway com...
Страница 87: ......
Страница 88: ...A MAN 850 SCSI JBOD USR GDE R0 8 03...