background image

GASOGEN

G3 40 2S

GASOGEN

G3 50 2S

1

2

3

4

5

6

7

8

9

10

11

11

11

12

12

13

13

20446

Fibre glass gasket 16x21

m. 1,45

m. 1,45

IMP0010

Grip M8

X

X

MAN0010

Handle grip

X

X

VOL0010

Handle

X

X

20446

Fibre glass gasket 16x21

m. 1,65

m. 1,65

GAM0010

Gasket diam. 24,5x10x3

X

X

GRP2021

Fan fixing kit

X

X

VNT0002

Fan

X

X

20446

Fibre glass gasket 16x21

m. 1,2

m. 1,2

16649

Tempered glass diam- 29,5x4

X

X

11547

Steel fire bars kit

X

11548

Steel fire bars kit

X

X

26953

Stone- cast iron bars insulation kit

X

26954

Stone- cast iron bars insulation kit

X

12346

Cast iron bars +insulation kit

X

12348

Cast iron bars +insulation kit

GASOGEN

G3 65 2S

m. 1,6

X

X

X

m. 1,8

X

X

X

m. 1,5

X

GASOGEN

G3 80 2S

m. 1,6

X

X

X

m. 1,8

X

X

X

m. 1,5

X

11

KIT0467

Steel fire bars kit

12

KIT0482

Steel fire bars kit

X

X

12

26955

Stone- cast iron bars insulation kit

13

26956

Stone- cast iron bars insulation kit

X

X

13

12350

Cast iron bars +insulation kit

14

12352

Cast iron bars +insulation kit

X

X

X

X

PUC0420

Triangular scraper

X

X

15

X

37353

Catalyst kit

15

X

37354

Catalyst kit

15

37355

Catalyst kit

X

15

37356

Catalyst kit

X

16

11930

Inspection door kit

17

11929

Flue chamber inspection door

X

X

X

X

X

X

X

X

BOILER MODEL

POS.

Part n°

DESCRIPTION

COMPONENT

WARNING: For a correct and quick processing of your orders, when ordering spare parts for your GASOGEN G3 2S boiler,
please always quote the following information:

Part number, Description, Quantity requested, Boiler model.

If you need any

parts not indicated in the above list, please contact an authorized Unical After Sales Service

GASOGEN

G3 25 2S

m. 1,2

X

X

X

m. 1,4

X

X

X

m. 1

X

X

X

X

X

X

X

X

11

11546

Steel fire bars kit

26952

Stone- cast iron bars insulation kit

12344

Cast iron bars +insulation kit

12

13

15

37352

Catalyst kit

Gasogen

22

Содержание G3 50 2S

Страница 1: ...Wood Fired Boiler Gasogen 29 93kW User Operating Instructions...

Страница 2: ...e according to the foreseen scopes it is necessary to carefully follow the instructions indicated in this manual 3 WATER TREATMENT The hardness of the mains water supply conditions the frequency with...

Страница 3: ...ustment and servicing of this appliance must be carried out by a competent quali fied person and installed in accordance with the current standards and regulations Failure to correctly install this ap...

Страница 4: ...the switch in the I position the boiler is connected to the mains electricity supply green led light illuminated and is ready to operate The recycle pump functions Mode selection keys With the switch...

Страница 5: ...about 65 C within the foreseen time control timer the fan and re cycling pump will be turned off Panel connected to the mains electricity supply but the boiler is not running Therefore repeat the lig...

Страница 6: ...sure If it is an open circuit system the pressure does not have to be restored as this occurs automatically via the water level regu lator inside the water tank If it is a sealed circuit system refer...

Страница 7: ...g this switch you can connect or disconnect the boiler from the mains electricity supply With the switch in the 0 position the boiler is not switched on green led light off With the switch in the I po...

Страница 8: ...he upper loading door has been closed With the switch 22 it is possible to select the operation mode wood or the back up gas or oil fired boiler Place the switch into the 0 position wood firing mode N...

Страница 9: ...or disconnect the sy stem pump boiler load from the mains electrical system With the switch in the 0 position the system pump is not switched on With the switch in the II position the system pump is...

Страница 10: ...u can connect or disconnect the fan from the mains electrical system Set the switch in the I position the fan is powered electrically but it will not run It will start running only after the upper loa...

Страница 11: ...ce the plastic cap The safety thermostat can intervene in case of boiler tempera ture overheating You can avoid this happening by lowering the working thermostat see above If the boiler s safety therm...

Страница 12: ...st be placed as previously described 6 3 CHECKSTO CARRY OUT BEFORE FIRING THE BOILER Before firing the boiler carry out the following checks Check that the On Off gas valve positioned upstream of the...

Страница 13: ...ore the quantity of wood burnt whilst the secondary air completes the combustion P Primary air box S Secondary air box 1 Metal ring air adjuster P S 1 S1 P1 S S P P1 C USEFUL SUGGESTIONS and LOADING E...

Страница 14: ...noisy excess of primary air P The flame must not be too small lack of primary air P If the ash does not falls down properly increase the pri mary air P If too much ash falls down reduce the primary ai...

Страница 15: ...aused by the wood s moisture content and the way the boiler is used PRECAUTIONS TO TAKE DURING BOILER OPERA TION After every air adjustment wait 5 to 10 minutes before making a new adjustment Once the...

Страница 16: ...loading Every week Remove carefully all the residues of combustion accumula ted in the fire box Clean with the brush supplied the triangular passes of the combustion chamber Remove the ashes from the...

Страница 17: ...ushing rod when the loading door is opened In this way the smoke accumulated in the firebox is aspirated and sent to the chimney directly The bypass in conclusion allows the smoke to be discharged at...

Страница 18: ...sed for long periods see paragraph 6 7 Use thicker wood logs Use up all the wood before loading a new batch Problem The boiler does not reach the requested temperature The flame is small and there is...

Страница 19: ...er does not remain unused for long periods see paragraph 6 7 Use bigger logs Use up all the wood before loading a new batch Problem The boiler does not reach the requested temperature The flame is sma...

Страница 20: ...9 5 6 8 7 8 7 1 2 4 3 10 2 1 2 4 3 9 10 2 6 5 8 7 Spare parts GASOGEN G3 25 2S GASOGEN G3 40 2S GASOGEN G3 50 2S GASOGEN G3 65 2S GASOGEN G3 80 2S Gasogen 20...

Страница 21: ...Spare parts GASOGEN G3 25 2S GASOGEN G3 40 2S GASOGEN G3 50 2S GASOGEN G3 65 2S GASOGEN G3 80 2S 14 11 13 12 15 16 17 21...

Страница 22: ...12 26955 Stone cast iron bars insulation kit 13 26956 Stone cast iron bars insulation kit X X 13 12350 Cast iron bars insulation kit 14 12352 Cast iron bars insulation kit X X X X PUC0420 Triangular...

Страница 23: ...ing Pty Ltd ABN 90 446 545 923 51 Assembly Tullamarine Vic 3043 Australia PO Box 356 Tullamarine Vic 3043 Australia 61 3 9330 3300 61 3 9310 5655 sales automaticheating com au Telephone Facsimile Emai...

Отзывы: