Installation Procedures
190-01810-00
GDL 82 TSO Installation Manual
Rev. 5
Page 6-2
6.1.1 Shielded Cable Preparation
1. At the end of the shielded cable, strip back 2.5 inch maximum length of the jacket to expose the braid.
2.
Remove the exposed braid.
3.
Carefully score the jacket 1/4 inches to 5/16 inches from the end and remove the jacket to leave the braid
exposed.
4.
Connected a 20 or 22 AWG wire to the exposed braid of the prepared cable. For termination techniques, refer to
AC 43.13.
Preferred Method
Slide a solder sleeve (1) onto the prepared cable and shrink using a heat gun. The chosen size of solder
sleeve must accommodate the number of conductors present in the cable assembly. Refer to M83519/1-2
for 2-conductor and M83519/1-3 for 3-conductor solder sleeves. Solder sleeves with preinstalled leads are
acceptable.
Alternate Method
a. Solder the wire (2) to the exposed braid of the prepared cable.
b. Ensure a solid electrical connection through the use of acceptable soldering practices.
c. Slide a piece of shrink tube (1) onto the prepared cable and shrink using a heat gun. The chosen size of
shrink tube must accommodate the number of conductors present in the cable.
Figure 6-1 Shield Termination
5.
Repeat steps 1 through 4 as needed for the remaining shielded cables.
2)6+,(/')2/'('
%$&.29(5-$&.(7
5()(5(1&(21/<
Содержание GDL 82
Страница 1: ...190 01810 00 March 2018 Revision 5 GDL 82 TSO Installation Manual ...
Страница 68: ......