13-11-607 Page 52
MAINTENANCE SCHEDULE (See Detail Notes)
Maintenance Action
As
indicated
by AUTO
SENTRY
W
Every
8
Hours
Every
125
Hours
Every
500
Hours
Every
2000 *
Hours
Every
Year
Change Air Filter
•
Change Water Filter
•
Check for Proper Load/Unload
•
Check Discharge Pressure/Temp
•
Check Dirt Accumulation on Cooler
•
Check Reservoir Oil Level
•
Change Compressor Lubricant (AEON 800)
•
•
•
Check Relief Valve
•
Check the Check Valve Seals
•
Add Grease to Inlet End Bearings
•
Check Water Quality **
•
Check Water Flow (RO Filter Discharge)
•
Check Condensate Flow at Aftercooler Separator
Drain
•
Check Condensate Level in Control Air Filter Bowl
•
Check Setting of Buffer Air Pressure Regulator
•
Check Setting of Buffer Water Pressure Regulator
•
*
IF OIL IS ANALYZED at the end of a maintenance interval (2000 hr. max.), and is found in
good condition, it may be used for the next 2000 hour interval – GD provides free oil analysis
services. OTHERWISE, IF OIL IS NOT ANALYZED at the end of any interval, it must be
changed.
**
Depends on water quality – longer periods may be used when the quality of water meets or
exceeds our standards consistently.
Содержание PUREAIR EWC99C
Страница 7: ...13 11 607 Page 2 Figure 1 2 PACKAGE ILLUSTRATION 307EWC797 B Ref Drawing...
Страница 8: ...13 11 607 Page 3 Figure 1 3 AIR WATER SCHEMATIC 308EWC797 F Ref Drawing...
Страница 25: ...13 11 607 Page 20 Figure 4 2 FLOW CHART FOR SETUP PROGRAMMING 300EWC1255 Ref Drawing...
Страница 38: ...13 11 607 Page 33 Figure 4 4 WIRING DIAGRAM FULL VOLTAGE 305EWC546 B Ref Drawing Page 1 of 2...
Страница 39: ...13 11 607 Page 34 305EWC546 B Ref Drawing Page 2 of 2...
Страница 40: ...13 11 607 Page 35 Figure 4 5 WIRING DIAGRAM FULL VOLTAGE LESS STARTER 306EWC546 B Ref Drawing Page 1 of 2...
Страница 41: ...13 11 607 Page 36 306EWC546 B Ref Drawing Page 2 of 2...