CONTROL PIPING – Control piping is not necessary
since the Electra–Screw

 unit is factory wired and

piped for the control system specified.

INLET LINE – Where an inlet line is used between the
air filter and the compressor, it must be thoroughly
cleaned on the inside to prevent dirt or  scale  from  en-
tering the compressor.  If welded construction is
used, the line must be shot blasted and cleaned to
remove welding scale.
  In either case, the inlet line
must be coated internally by galvanizing or painting
with a moisture and oil–proof sealing lacquer.  Up to ten
(10) feet (3 meters) in length, the inlet line should be the
full size  of  the  inlet opening on the compressor.  If an
extra–long line is necessary, the pipe size should be in-
creased according to Inlet Line Length Chart,
FIGURE 2–4, page 11.

Accessibility for inlet air filter servicing must be consid-
ered when relocating the filters from the unit to a remote
location.

DISCHARGE SERVICE LINE – The discharge service
line connection is made at the upper right hand corner
of the cooler, viewed from the oil cooler side. A hand op-
erated valve, (air service valve) must be installed be-
tween the unit and the customer’s air system. When
manifolding two or more Electra–Screw

 units on the

same line, each unit is isolated by the check valve in the
unit discharge line. If an Electra–Screw

 unit is man-

ifolded to another compressor, be sure the other com-
pressor has a check valve in the line between the ma-
chine and the manifold. If an Electra–Screw

 and a

reciprocating compressor are manifolded together, an
air receiver must be located between the two units.

Discharge air used for breathing will
cause severe injury or death.

Consult filtration specialists for addi-
tional filtration and treatment equip-
ment to meet health and safety stan-
dards.

BLOWDOWN VALVE PIPING – The blowdown valve
is fitted with a muffler for operation indoors.  If the instal-
lation requires, the muffler may be removed and the
blowdown valve piped to the outside with a pipe size the
same as the blowdown valve outlet connection.

ELECTRICAL WIRING

Electrical shock can cause injury or
death.  Open main disconnect switch,
tag and lockout before working on
starter/control box.

Standard Units – The Electra–Screw

 compressor is

factory wired for all starter to motor and control connec-
tions for the voltage specified on the order. It is neces-
sary only to connect the unit starter to the correct power
supply. The standard unit is supplied with an open drip–
proof motor, a NEMA 12 starter and control enclosure.
See ”Location” paragraph, page 9, for distance to the
nearest obstruction on starter and control box sides of
the unit.

The overload heaters are to be selected according to
starter manufacturer’s tables, which are attached to
the inside of the control box, based on motor nameplate
full load amperage.

GROUNDING – Equipment must be grounded in ac-
cordance with Section 250 of the National Electrical
Code.

Failure to properly ground the com-
pressor package could result in con-
troller malfunction.

MOTOR LUBRICATION – Long time satisfactory op-
eration of an electric motor depends in large measure
on proper lubrication of the bearings.  The following
charts show recommended grease qualities and re-
greasing intervals for ball bearing motors.  For addition-
al information refer to the motor manufacturer’s
instructions.  The following procedure should be used
in regreasing:

1.

Stop the unit.

2.

Disconnect, tag and lockout the unit from the pow-
er supply.

3.

Remove the relief plug and free hole of hardened
grease.

Содержание ELECTRA-SCREW EDEQHH

Страница 1: ...R ELECTRA SCREW STATIONARY BASE MOUNTED COMPRESSORS DOMESTIC MODELS EDEQHH 40 HP EDEQJH 50 HP INTERNATIONAL MODELS EDEQHJ 40 HP 30 KW EDEQJJ 50 HP 37 KW OPERATING AND SERVICE MANUAL 13 8 610 6th Editi...

Страница 2: ...nver Air Compressor distributor refer to the yellow pages of your phone directory or contact Distribution Center Factory Gardner Denver Machinery Inc Gardner Denver Machinery Inc Master Distribution C...

Страница 3: ...ll cause severe personal injury death or substantial property damage if the warning is ignored Warning is used to indicate the presence of a hazard which can cause severe person al injury death or sub...

Страница 4: ...ORDERING REPAIR PARTS When ordering parts specify Compressor MODEL Method of Cooling HORSEPOWER and SERIAL NUMBER see nameplate on unit The Serial Number is also stamped on top of the cylinder flange...

Страница 5: ...Oil Separator 32 Compressor Oil System 27 Compressor Oil System Check 33 Compressor System Air Flow 1 CONSTANT RUN Button with LED 19 Control Piping 12 Control System Operation 18 AUTO LAG Button with...

Страница 6: ...System 30 Moisture Separator Trap 11 Motor Grease Recommendations 13 Motor Lubrication 12 Motor Overload LED 19 Motor Protection Devices 16 Motor Regreasing Interval 13 Oil Change Interval 30 Oil Coo...

Страница 7: ...CHECK LIST AIR FILTER 38 Service Check List 38 Every 1000 Hours Operation 38 Every 125 Hours Operation 38 Every 6000 Hours Operation 38 Every 8 Hours Operation 38 Every Year 38 Motor Lubrication 38 O...

Страница 8: ...Definition of Error Messages 20 Figure 4 5 Pressure Chart 22 Figure 4 6 Subtractive Pilot Closed 23 Figure 4 7 Subtractive Pilot Opened 23 Figure 4 8 Maximum Setpoints for Auto Sentry S Controller PS...

Страница 9: ...rs B As meshing continues more of the main rotor lobe enters the sec ondary rotor grove normal volume is reduced and pressure increases Oil is injected into the cylinder to remove the heat of compress...

Страница 10: ...13 8 610 Page 2 200EDE797 Ref Drawing FIGURE 1 2 PACKAGE MINIMUM PRESSURE CHECK VALVE MIXING VALVE OIL FILTER...

Страница 11: ...13 8 610 Page 3 200EDE797 Ref Drawing FIGURE 1 3 PACKAGE OIL LEVEL GAUGE SEPARATOR AIR FILTER...

Страница 12: ...13 8 610 Page 4 202EDE797 Ref Drawing FIGURE 1 4 PACKAGE CONTROLLER STARTER BOX...

Страница 13: ...g drain plugs covers the thermostat ic mixing valve or break any connections etc in the compressor air or oil sys tem until the unit is shut down and the air pressure has been relieved D Electrical sh...

Страница 14: ...be fore working on the unit this machine is automatically controlled and may start at any time D An Excess Flow Valve should be on all compressed air supply hoses ex ceeding 1 2 inch inside diameter...

Страница 15: ...13 8 610 Page 7 DECALS 206EAQ077 212EAQ077 218EAQ077 211EAQ077 207EAQ077...

Страница 16: ...13 8 610 Page 8 DECALS 216EAQ077 217EAQ077 222EAQ077 221EAQ077 208EAQ077...

Страница 17: ...tected from rain snow and freezing temperatures in a clean well lighted well ventilated area with ample space all around for mainte nance Select a location that provides a cool clean dry source of air...

Страница 18: ...unit for the doors to open completely Any of the enclosure doors may be removed by opening the door and lifting it up slightly to disengage the hinges Do not operate the compressor with the fan and b...

Страница 19: ...lation next to a heated building where enough heat can be used to keep the compressor room above freezing will save many complications in the operation and installation of the unit Refer to Engineerin...

Страница 20: ...e injury or death Consult filtration specialists for addi tional filtration and treatment equip ment to meet health and safety stan dards BLOWDOWN VALVE PIPING The blowdown valve is fitted with a muff...

Страница 21: ...MOTOR GREASE RECOMMENDATIONS Standard High Service Temperature Worked Penetration 265 296 220 240 Grease Viscosity SSU At 100_F 38_ C 400 550 475 525 Soap Type Lithium Lithium N H Bomb Minimum Hours...

Страница 22: ...he unit and release air pressure tag and lockout the power supply to the starter Failure to re lease pressure or properly discon nect the power may result in personal injury or death During unloaded o...

Страница 23: ...e air ser vice valve The unit is equipped with a minimum 65 psig 4 5 Bars pressure check valve no special procedure to main tain the unit reservoir pressure is required Unit Hot No warm up period is r...

Страница 24: ...rnished for the starter in the voltage range specified There are three 3 overloads in the starter of proper size for the starter and its enclo sure Note that motor nameplate current must be multi plie...

Страница 25: ...re Periodic checks should be made to insure that it is operating properly The relief valve should be tested for proper operation at least once every year To test the relief valve raise the system oper...

Страница 26: ...positive pressure on the oil system even when the air service valve is fully open The valve senses upstream pres sure If demand for air exceeds the compressor capac ity the valve throttles the flow t...

Страница 27: ...mpressor or oil separator discharge At the time of a high temperature shutdown the LED is illuminated and the temperature digital readout is locked on to the of fending temperature Illumination of the...

Страница 28: ...by a flashing STOP RESET LED If all readouts and LED s are flashing a power interruption has occurred requiring the control panel to be reset Programming The Load Unload Pressure Set points Programmin...

Страница 29: ...nt that rotation is reversed Press Stop Reset to exit jog mode Step 9 The displays will now read Pressure Temperature or If this compressor is equipped with the ex pansion board for the remote control...

Страница 30: ...program ming the setpoints Operation at excessive discharge air pressure can cause personal injury or damage to equipment Do not set un load pressure above the maximum stamped on the unit nameplate St...

Страница 31: ...phragm and ports cleaned when necessary Operating Air Pressure Adjustment The Auto Sentry S controller load and unload pressure setpoints should already be programmed See page 20 and FIGURE 4 8 page 2...

Страница 32: ...SSURE FULL LOAD OPERATING PRESSURE LOAD UNLOAD 100 PSI 6 9 Bars 100 PSI 6 9 Bars 108 PSI 7 5 Bars 125 PSI 8 6 Bars 125 PSI 8 6 Bars 133 PSI 9 2 Bars 150 PSI 10 4 Bars 150 PSI 10 4 Bars 158 PSI 10 9 Ba...

Страница 33: ...13 8 610 Page 25 FIGURE 4 10 WIRING DIAGRAM FULL VOLTAGE DUAL CONTROL 204EDE546 Ref Drawing...

Страница 34: ...13 8 610 Page 26 FIGURE 4 11 WIRING DIAGRAM WYE DELTA 205EDE546 Ref Drawing...

Страница 35: ...compressor and the air passes to the final discharge line RECOMMENDED LUBRICANT Gardner DenverR compressors are factory filled with AEONt lubricants These lubricants are formulated to the highest qual...

Страница 36: ...ller plug run and check for leaks DO NOT OVERFILL The quantity required to raise the oil level from ADD to FULL is shown in FIGURE 5 2 Repeated addition of oil between oil changes may indicate excessi...

Страница 37: ...See Maintenance Schedule page 38 Air oil under pressure will cause severe personal injury or death Shut down compressor relieve system of all pressure disconnect tag and lockout power supply to the s...

Страница 38: ...e oil more frequently Operating conditions and the appear ance of the drained oil must be surveyed and the oil change intervals planned accordingly by the user Gardner DenverR offers a free oil analys...

Страница 39: ...l be of little benefit if done in a care less manner Excessive oil carry over can damage equipment Never fill oil reservoir above the FULL marker COMPRESSOR OIL FILTER FIGURE 1 2 page 2 This replaceab...

Страница 40: ...r separator com bines multiple functions into one vessel The lower half is the oil reservoir providing oil storage capacity for the system and the top portion a primary oil separation means The reserv...

Страница 41: ...piping and tub ing may be at high temperature during and after operation 1 Be certain the unit is off and all system pressure is relieved 2 Disconnect tag and lockout the power supply to the starter...

Страница 42: ...pressure as described above Oil Cooler Temperature Differential Air Cooled Radiator The oil temperature differential depends on the temperature of the air at the oil cooler fan and cleanliness of the...

Страница 43: ...ment 2 Visually inspect the element If cleaning is not necessary reinstall the filter element If the ele ment requires cleaning go through steps 3 4 and 5 3 Wash the element by soaking about 15 minute...

Страница 44: ...old detergent to allow the element to be fully submerged b Place the element into the cleaning solution and allow to soak for five minutes Agitate in solution for two more minutes Elements contaminate...

Страница 45: ...e the belts and replace with new belts Check for correct belt tension and re attach the wire guard Interference between the fan and the orifice can damage equipment Be certain the orifice has even cle...

Страница 46: ...for dirt accumulation on oil aftercooler core faces and the cooling fan If cleaning is required clean the exterior fin surfaces of the cores by blowing compressed air carrying a nonflammable safety so...

Страница 47: ...rature switch malfunction 3 Blown fuse in starter 3 Replace fuse control box investigate if fuses continue to blow 4 Motor starter overload 4 Reset and investigate heaters trip cause of overload Compr...

Страница 48: ...mpressor oil 5 Add oil to proper level Excessive Oil Consumption 1 Oil carryover through lines 1 See Oil Carryover in this section 2 Oil leaks at all fittings 2 Tighten or replace fittings and gaskets...

Страница 49: ...65 psig 4 5 Bars 4 Sticky minimum pressure 4 Disassemble and clean valve 5 Defective minimum 5 Rebuild or replace pressure valve Won t set at 65 psig 4 5 Bars CHANGE SEPARATOR light 1 Separator differ...

Страница 50: ...7 and wire number 6 at board If the reading is zero replace the vacuum switch 2 Control board fault 2 Measure the AC voltage between wire number 7 and wire number 6 at board If the reading is 24 volts...

Страница 51: ...corresponding transducer at the control board with zero pressure on the transducer If 3 10 to 3 60 volts replace the transducer Oil leak at the bottom of 1 Gasket leaking 1 Replace the gasket the sea...

Страница 52: ...gment is proved not to be as warranted Labor shall be limited to the amount specified in the Company s labor rate schedule Labor costs in excess of the Company rate schedule amounts or labor provided...

Страница 53: ......

Отзывы: