37- 1- 613 Page 45
14. Using the correct installation tool, press the
seal down into the bore. Verify that the seal face
is below the bearing spacer face. Repeat for
other shaft.
15. With a micrometer, FIGURE 7 - 15, page 43,
mea- sure the thickness of shaft shim sets
established in Steps 5 thru 8. Be sure shims are
clean of dirt and oil for true measurement.
16. Check the end of the bearing spacer for dirt and
burrs. Be sure the bearing spacer is solid against
the rotor. Slide shim set over the shaft extension,
FIGURE 16, page 38, up against the end of the
bearing spacer.
FIGURE 7- 13
Содержание 5CDL-R Series
Страница 14: ...37 1 613 Page 13 FIGURE 2 3 BELT DRIVE OVERHUNG LOAD CALCULATIONS...
Страница 17: ...37 1 613 Page 16 TOP INLET MAIN ROTOR DRIVE FIGURE 2 4 OUTLINE DIMENSIONS...
Страница 30: ...37 1 613 Page 29 SECTION 5 PARTS LIST FOR LIST OF PARTS SEE PAGES 30 31 301CBH810 00 Ref Drawing...
Страница 40: ...37 1 613 Page 39 FIGURE 6 10 FIGURE 6 11 JACK SCREWS...