37- 1- 613 Page 38
JACK SCREWS
DOWEL PINS
FIGURE 6- 7
FIGURE 6- 8
FIGURE6-10, page 31. Handle with care to
prevent burrs on rotors and housing.
Never reuse shaft seals that have
been in operation. Refer to “Rotor
Shaft Seal,” page 17.
11. After removal of the rotors, rearrange blocking so
the discharge end bearing carrier hangs free.
Remove all screws and jack the carrier evenly
from the dowel pins, FIGURE 11, page 36
Support the carrier as it is removed.
8.
Remove the discharge end carrier cover, oil sling-
er, clamp plate, bearing locknut and bearing
clamp plates. See FIGURE 8.
9.
Rig the plate (shown in FIGURE6-2, page 33)
and the puller as shown in FIGURE6-9 and
press the rotor shaft through the bearings.
Use a shaft protector. Be sure the bolts holding
the plate are threaded into the tapped holes of
the bearing housing far enough to prevent
stripping of the threads, and evenly adjusted so
the plate is square with the shaft. Press one rotor
through the bearing at a time, then proceed to
Step 10. Repeat Steps 9 and 10 on the second
rotor.
10. When the rotor shaft is free of bearings, work the
rotor through the housing and rig a sling to
complete removal of the rotor from the housing,
SHAFT PROTECTOR
FIGURE 6- 9
Содержание 5CDL-R Series
Страница 14: ...37 1 613 Page 13 FIGURE 2 3 BELT DRIVE OVERHUNG LOAD CALCULATIONS...
Страница 17: ...37 1 613 Page 16 TOP INLET MAIN ROTOR DRIVE FIGURE 2 4 OUTLINE DIMENSIONS...
Страница 30: ...37 1 613 Page 29 SECTION 5 PARTS LIST FOR LIST OF PARTS SEE PAGES 30 31 301CBH810 00 Ref Drawing...
Страница 40: ...37 1 613 Page 39 FIGURE 6 10 FIGURE 6 11 JACK SCREWS...