![Gardener Denver Elmo Rietschle VFS 201 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/gardener-denver/elmo-rietschle-vfs-201/elmo-rietschle-vfs-201_operating-instructions-manual_3502106005.webp)
���
VFS 201
VFS 220.80
���
[mm]
[mm]
VFS
VFS 201
VFS 220.80
Gardner Denver
Schopfheim GmbH
Postfach 1260
79642 SCHOPFHEIM
GERMANY
Fon +49 7622 / 392-0
Fax +49 7622 / 392-300
e-mail: er.de@
gardnerdenver.com
www.gd-elmorietschle.com
Operating Instructions
Vacuum pump
A
Vacuum connection
B
Exhaust air connection G
1
/
2
C
Cooling water inlet G
1
/
4
D
Cooling water outlet G
1
/
4
E
Cooling air entry
F
Cooling air exit
H
Oil filling point
I
Oil check
K
Oil drain point
M
Oil type plate
N
Data plate
O
Direction of rotation
U
Gas ballast valve
X
Tapped holes for the transport rings
A
1
1. Vacuum connection (packaging vacuum)
A
2
2. Vacuum connection (forming vacuum)
B
Exhaust air connection G
1
/
2
C
Cooling water inlet G
1
/
4
D
Cooling water outlet G
1
/
4
E
Cooling air entry
F
Cooling air exit
H
Oil filling point
I
Oil check
K
Oil drain point
M
Oil type plate
N
Data plate
O
Direction of rotation
U
Gas ballast valve
X
Tapped holes for the transport rings
YE 206
2.5.2000
Prematic AG, Märwilerstrasse 43, 9556 Affeltrangen www.prematic.ch
Tel. 071 918 60 60, Mail: [email protected]