TSP & Remote TSP Controller Users Manual
8
Installation
Receiving and Unpacking
Check the equipment received against the packing list enclosed to insure that all items shipped have been
received. If there are any shortages, notify the carrier and Gamma Vacuum. Save all packaging material for
inspection.
Inspect for any obvious damage. If the equipment is damaged in any way, a claim should be filed with the carrier
(one copy to Gamma Vacuum). If equipment is to be retuned for inspection or repair, authorization must be
obtained from Gamma Vacuum Prior to reshipping. Instructions for return will be provided at that time.
Safety Notices
WARNING:
GAMMA VACUUM CONTROL UNITS DESIGNED FOR ION-PUMP OPERATION
ARE CAPABLE OF DELIVERING 7000 VDC UNDER OPEN CIRCUIT OR LOW PRESSURE
OPERATING CONDITIONS.
GAMMA VACUUM PRODUCTS ARE DESIGNED AND
MANUFACTURED TO PROVIDE PROTECTION AGAINST ELECTRICAL AND MECHANICAL
HAZARDS FOR THE OPERATOR AND THE AREA SURROUNDING THE PRODUCT.
OBSERVE ALL INFORMATION IN THIS SECTION.
Installation procedures are for use by qualified and authorized personnel who have experience working with
voltages greater than 50 volts. To avoid personal injury, do not perform any installation or service procedures
unless qualified to do so.
There are no serviceable parts inside the Remote TSP Controller.
Do not operate the control without a proper electrical ground or near water. The control may be damaged and its
safety reduced, if it is operated outside of its specifications.