5
All copying, even partial, of this manual is strictly forbidden
RG66007967 - Rev 02
1 YOUR
INSTALLATION
All the tips required for a perfect installation of the equipment are found in the installation manual.
It is important to place a net filter at both water circuit inlets, which must be made of stainless steel
with a mesh that does not exceed 1 mm.
2 YOUR
CONNECTION
All connections must be made correctly. The COMMISSIONING REQUEST FORM lists all that must be
checked before requesting unit start-up.
3 YOUR
REQUEST
Send the request form found in the unit documentation by fax, at least one week in advance. Should
this form not be found, please contact GALLETTI:
Tel. (+39) 051 8908111 - Fax (+39) 051 8908122 - e-mail: assistenza
@galletti
.it
4 OUR
APPOINTMENT
Galletti will organise this by asking the Authorised Technical Service Centre in your area to contact
you.
5 OUR
TEST
All the preliminary checks and unit test will be performed together with your personnel.
Your personnel will be provided with instructions for correct unit management.
6 OUR
GUARANTEE
The Authorised Technical Service Centre will issue a test certificate once the test is performed, which
represents the warranty of the unit.
Galletti S.p.A. provides you with a customised maintenance program.
START-UP INSTRUCTIONS