Column
Float switch
assembly
Procedure
• Connect the product delivery hoses to the internal delivery pipes, starting with
module C (closest to the column), according to the following image.
• Connect the product feed line hoses assemblies (x3) to the feed line assembly
shown in Figure 5.
• Fit the float switch assembly using the studs provided, as shown in the image
below. Position the float switch as low as possible. Verify that float is free to move
upwards without obstruction.
• Using the cable clips, route the float switch cable through the cable duct out of the
sump to the Multiplexer board located under the head cabinet.
• Install module C. Fit the hinge pin then lift above the sump and brace to hold the
module in place.
• Attach feed and delivery hoses to the meter module.
• Repeat the last two steps for modules B and A.
Figure 15. Product Delivery Hoses Connection
Figure 16. Float Switch Assembly Installation
19
APOLLO 3000L INSTALLATION
2A03229 APOLLO 3000L Installation and Commissioning Manual Issue 1
Содержание APOLLO 3000L
Страница 1: ...Part No 2A03229 Issue 1 APOLLO 3000L Installation and Commissioning Manual...
Страница 48: ......