
Configuring G-SPEED Studio XL
G SPEED
STUDIO
XL
with Thunderbolt™
p. 43
Managing Background Activities
Background activity management includes:
• “Viewing Current Background Activities”
• “Adding a Scheduled Background Activity”
• “Changing a Background Activity Schedule”
• “Enabling or Disabling a Scheduled Background Activity”
• “Deleting a Scheduled Background Activity”
• “Media Patrol”
• “Redundancy Check”
• “Initialization”
• “Rebuild”
• “Migration”
• “PDM”
Background activities perform a variety of preventive functions on your physical drives, disk arrays,
logical drives and other components.
You can run a background activity immediately or schedule it to run at a later time. Scheduling
options are described below.
Setting options for each activity are listed after the scheduling options. These settings determine
how the background activity affects I/O performance
Viewing Current Background Activities
To view a list of background activities, click on the
Background Activities
icon in the Toolbar.
The following list of background activities will appear:
• Media Patrol
• Redundancy Check
• Rebuild
Currently running activities show a progress bar.
• Transition
• Synchronization
• Migration
• PDM
• Initialization
Содержание G SPEED STUDIO XL
Страница 4: ...Safety General Use Safety Precautions p 5 Backup Your Data p 6 MakeTwoBackups p 6 ...
Страница 11: ...Using Your Drive Drive Activity LED p 12 Warning LED and Alarms p 13 Disconnect the Drive p 14 ...
Страница 24: ...Configuring G SPEED Studio XL G SPEED STUDIO XL with Thunderbolt p 24 Thunderbolt daisy chain connections HDMI ...
Страница 112: ...Appendix RAID Levels Explained p 113 ...
Страница 114: ...Support Warranty Technical Support p 115 Limited Warranty p 116 Copyright p 118 ...