![Furuno FCV-38 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/furuno/fcv-38/fcv-38_installation-manual_2349640023.webp)
2. WIRING
2-3
2.1.2
Internal wiring and cable clamp position
*1: The cable fabrication is required. See section 2.1.3
DIP switch setting
Set the DIP switches on the PIF board (10P7099) as follows.
Clamp
position
Connect to
Cable from
Cable
1
TB3
NMEA0183 equipment
TTYCSLA-4*
1
2
TB4
3
TB5
4
TB6
5
TB7
6 to 7
—
Not used
—
8
J1
Control unit
—
9
J2
Control unit
—
10 to 12
—
Not used
—
1
2
3
4
5
(6) (7)
(10)
(11)(12)
8 9
TB3
TB4
TB5
TB6
J1
TB7
J2
Secure each cable to the
wiring clamp.
Terminal opener
Cable clamp
Fasten the crimp-on lug (drain
wire) of the TTYCSLA cable.
10P7099
The entrance numbers with “()” are not used.
PIF board (10P7099)
DIP switch
DIP SW
S1-1
S1-2
S1-3
S1-4
Setting
ON
OFF
OFF
OFF
Содержание FCV-38
Страница 8: ...EQUIPMENT LISTS vi This page is intentionally left blank ...
Страница 58: ...3 INITIAL SETTINGS 3 24 This page is intentionally left blank ...
Страница 66: ...D 1 9 Sep 2019 H MAKI ...
Страница 67: ...D 2 3 Aug 2020 H MAKI ...
Страница 68: ...D 3 3 Oct 2019 H MAKI ...
Страница 69: ...D 4 26 Sep 2019 H MAKI ...
Страница 70: ...D 5 14 Jun 2018 H MAKI ...
Страница 71: ...D 6 14 Jun 2018 H MAKI ...
Страница 72: ...D 7 14 Jun 2018 H MAKI ...
Страница 73: ...D 8 Jun 10 05 ...
Страница 74: ...D 9 ...
Страница 75: ...Oct 22 07 R Esumi D 10 ...
Страница 76: ...D 11 9 Oct 2019 H MAKI ...
Страница 77: ...D 12 9 Oct 2019 H MAKI ...
Страница 78: ...D 13 11 Mar 2010 Y NISHIYAMA ...
Страница 79: ...D 14 15 Apr 2020 H MAKI ...