![Furuno FCV-38 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/furuno/fcv-38/fcv-38_installation-manual_2349640017.webp)
1. MOUNTING
1-9
2. Wrap the two flank sponges around the sides of the transducer. Face the cut side
toward the transducer and insert the uncut part between the transducer and the
TD attachment.
3. Secure the sponge in place with a hose clamp (stainless band). Apply silicone
sealant (local supply) to the screws to prevent seizing and corrosion.
4. Refit the press plate as before. Tighten the double nuts at 63.5Nm torque.
5. To attach to the ship’s bottom, refer to the T625 tank drawing.
TD attachment
Insert the uncut
part between the
transducer and the
TD attachment.
Flank sponge
Stainless band
Silicone sealent
Содержание FCV-38
Страница 8: ...EQUIPMENT LISTS vi This page is intentionally left blank ...
Страница 58: ...3 INITIAL SETTINGS 3 24 This page is intentionally left blank ...
Страница 66: ...D 1 9 Sep 2019 H MAKI ...
Страница 67: ...D 2 3 Aug 2020 H MAKI ...
Страница 68: ...D 3 3 Oct 2019 H MAKI ...
Страница 69: ...D 4 26 Sep 2019 H MAKI ...
Страница 70: ...D 5 14 Jun 2018 H MAKI ...
Страница 71: ...D 6 14 Jun 2018 H MAKI ...
Страница 72: ...D 7 14 Jun 2018 H MAKI ...
Страница 73: ...D 8 Jun 10 05 ...
Страница 74: ...D 9 ...
Страница 75: ...Oct 22 07 R Esumi D 10 ...
Страница 76: ...D 11 9 Oct 2019 H MAKI ...
Страница 77: ...D 12 9 Oct 2019 H MAKI ...
Страница 78: ...D 13 11 Mar 2010 Y NISHIYAMA ...
Страница 79: ...D 14 15 Apr 2020 H MAKI ...