J OIL-E-08 2008
F03210
2
11
Steam Pressure Gauge
Steam Cock
Syphon
Plug
2.12 STEAM PRESSURE gAUgE
The steam pressure gauge assembly should be assembled in accordance with
Fig. 9
using a suitable
sealant on all joints.
The gauge should be facing front towards the electrical control box and/or the operator of the boiler.
Screw the assembly into the top of the boiler and connect the copper tube from the pressure controller
located on the side of the control box to the nipple provided on the assembly.
FIg. 9 STEAM PRESSURE gAUgE
Test Point
2.16 COMMISSIONINg THE BOILER
It is essential that the commissioning procedures listed below are carried out by a Fulton Service
Engineer who will have the necessary experience and testing equipment to ensure that the installation
is not only correct, but is operating safely and at optimum efficiency.
FLUE COMMISSIONINg
Prior to initial firing of the boiler, the flue must be checked for leaks.
This is done by BOTH of the following methods:
Visual Inspection
Check joints between all flue sections for quality of seals. Where the flue passes through the
structure of the building use your judgement as to the integrity of this section of the flue.
Smoke Test
With the flue capped, the drain stabilizer pipe (if fitted) blanked and a smoke generator
inserted into the flue, there should be no smoke visible from the flue.
If either of these tests fail or at any time during boiler operation, there is doubt about the
integrity of the flue, shut down the boiler and contact Fulton Boiler Works Immediately.
2
Содержание 10J
Страница 42: ...J OIL E 08 2008...
Страница 56: ...J OIL E 08 2008 A0 2 1 BOILER OIL 1 2 3 4 5 6 December 12 2004...
Страница 74: ...J OIL E 08 2008 E1 6 1 WATER COLUMN 6 60 December 2004 E1 6 1 12 2004 1 11 6 4 2 9 10 4 6 4 5 3 8 7...
Страница 76: ...J OIL E 08 2008 F1 4 1 WATER LEVEL GAUGE ASSEMBLY 6 60 350mm and 300mm Clifton December 2004...
Страница 84: ...J OIL E 08 2008 H1 1 1 PUMP FEED WATER 1 December 2004...
Страница 86: ......