J OIL-E-08 2008
4
4.6 SIx MONTHLy
(including three monthly)
It should be noted that after a Fulton boiler has been in operation for several months, pieces of burned metal
will be found in the space at the bottom of the boiler. These pieces of metal are the remains of a light gauge
metal form which was used during manufacture for forming the boiler insulation. This is normal and does not
affect the efficiency or the life of the boiler in any way.
18.
Remove the cover plates and clean-out door. Clean out the flue passes. Check the
refractories for soot or breakage, inspect the stainless steel ring. When replacing the cover
plates and clean-out door, use furnace cement to ensure a tight seal, thus preventing the
escape of hot gases.
19.
Apply a small quantity of oil to the bearings of the burner motor and the feed water pump motor.
20.
Drain and flush the feed water tank. Clean any filters in the tank, in the feed water line or in the
feed water pump.
21.
Remove and clean the water probes, take care not to crack the porcelain. After replacement
of the probes, check the operation of the low water cutoff relay and of the feed water pump.
22.
Remove the air gate and clean the fan.
23.
Test the flue using the following procedure:
Visual inspection
Check joints between all flue sections for quality of seals. Where the flue passes through
the structure of the building use your judgement as to the integrity of this section of the
flue.
Smoke test
With the flue capped and a smoke generator inserted into the flue, their should be no
smoke visible.
If either of these tests fail, shut down the boiler and contact Fulton Boiler Works immediately.
24.
Remove the water gauge and water column. Rod through the top connections of both to ensure
the holes in the baffle plates (approx. 6mm dia.) inside the boiler are not obstructed.
26.
Check the burner combustion to ensure that excess air and carbon monoxide values are within
normal limits (see combustion values in section 5).
FIg. 20 FLUE CLEANINg
Cleaning the Flues
Remove the cleanout door to the flue
passes and to the bottom of the boiler.
36
4
Содержание 10J
Страница 42: ...J OIL E 08 2008...
Страница 56: ...J OIL E 08 2008 A0 2 1 BOILER OIL 1 2 3 4 5 6 December 12 2004...
Страница 74: ...J OIL E 08 2008 E1 6 1 WATER COLUMN 6 60 December 2004 E1 6 1 12 2004 1 11 6 4 2 9 10 4 6 4 5 3 8 7...
Страница 76: ...J OIL E 08 2008 F1 4 1 WATER LEVEL GAUGE ASSEMBLY 6 60 350mm and 300mm Clifton December 2004...
Страница 84: ...J OIL E 08 2008 H1 1 1 PUMP FEED WATER 1 December 2004...
Страница 86: ......