The installation of a Series J Oil Fired Steam Boiler should be carried out by competent personnel in
accordance with all relevant safety regulations. It is the responsibility of the installer to ensure that these
regulations are complied with.
2.2 SITINg
The boiler house should be sufficiently large to allow easy and safe access to all parts of the boiler for
installation, operation and maintenance purposes. Reference should be made to
Section 5 - general
Data
to ascertain the relevant dimensions and special note taken of the vertical clearance required for
the removal of the burner.
The flooring must be level, laid in a non-combustible material and be of sufficient strength to support the
boiler.
2.3 VENTILATION
Adequate fresh, clean air is necessary for safe and efficient combustion, and should be provided at
high and low level in accordance with IGE/UP/10 Edition 2. It is essential that only fresh air is allowed
to enter the combustion air system. Foreign substances, such as combustible and volatile materials in
the combustion system can create hazardous conditions.
Note
:
(a) Ensure there is adequate ventilation in the boiler room. Lack of ventilation will create a high
temperature and cause control lockout.
(b) Do not keep exhaust fans running with windows, doors and vents closed, this will interfere with
the necessary boiler draught.
(c)
Do not store chemicals such as perclorethylene in the boiler house, the fumes may damage the
boiler and flue and cause the burner to lock out on flame failure.
Ventilation requirements
Boiler Model
6J
8J
10J
15J
20J
30J
40K 50J
60J
High Level (cm
2
)
305
360
420
560
700
980
1260 1540 1820
Low Level (cm
2
)
610
720
835
1115 1395 1960 2520 3085 3645
2
2
Содержание 10J
Страница 42: ...J OIL E 08 2008...
Страница 56: ...J OIL E 08 2008 A0 2 1 BOILER OIL 1 2 3 4 5 6 December 12 2004...
Страница 74: ...J OIL E 08 2008 E1 6 1 WATER COLUMN 6 60 December 2004 E1 6 1 12 2004 1 11 6 4 2 9 10 4 6 4 5 3 8 7...
Страница 76: ...J OIL E 08 2008 F1 4 1 WATER LEVEL GAUGE ASSEMBLY 6 60 350mm and 300mm Clifton December 2004...
Страница 84: ...J OIL E 08 2008 H1 1 1 PUMP FEED WATER 1 December 2004...
Страница 86: ......