
26
Upgrade and Maintenance Manual
TX140
S2
Before you start
2.3
Tools you need at hand
When preparing the maintenance task, ensure that all required tools are
available according to the overview below. You will find a list of required tools at
the beginning of each procedure.
Assembly,
rack installation
yes
Reassembling the server, installing the
server in the rack (if applicable)
Starting up
no
Booting time depends on hardware and
software configuration and may vary
significantly.
Screw driver /
Bit insert
Screw
Usage
Type
Phillips
PH2 / (+) No. 2
hexagonal cross
SW5 / PZ2
Backup drives,
optical disk
drives, chassis
M3 x 4.5 mm
(silver)
C26192-Y10-C67
Phillips
PH2 / (+) No. 2
USB 3.0
interface card
D3305
M3 x 5 mm
(silver)
(contained in card
kit S26361-D3305-
A10)
Phillips
PH2 / (+) No. 2
hexagonal cross
SW5 / PZ2
System board
M3 x 6 mm
(silver)
C26192-Y10-C68
Phillips
PH2 / (+) No. 2
hexagonal cross
SW5 / PZ2
Backup drives
with UNC
thread
UNC
6-32 x 4.76 mm
(black)
C26192-Y10-C75
Table 2: List of required tools and used screws
Step
included
Explanation
Table 1: Calculation of the average task duration
Содержание PRIMERGY TX140 S2
Страница 30: ...30 Upgrade and Maintenance Manual TX140 S2 Before you start ...
Страница 98: ...98 Upgrade and Maintenance Manual TX140 S2 Basic software procedures ...
Страница 120: ...120 Upgrade and Maintenance Manual TX140 S2 Power supply ...
Страница 148: ...148 Upgrade and Maintenance Manual TX140 S2 Hard disk drives solid state drives ...
Страница 158: ...158 Upgrade and Maintenance Manual TX140 S2 System fan and air duct ...
Страница 208: ...208 Upgrade and Maintenance Manual TX140 S2 Expansion cards and backup units ...
Страница 216: ...216 Upgrade and Maintenance Manual TX140 S2 Main memory ...
Страница 314: ...314 Upgrade and Maintenance Manual TX140 S2 Cabling ...
Страница 332: ...332 Upgrade and Maintenance Manual TX140 S2 Appendix ...