Step
included
Explanation
Server shutdown
no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
Software tasks necessary before
maintenance, see
.
Rack removal,
disassembly
yes
Making the server available, removing the
server from the rack (if applicable).
Transport
no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
Maintenance procedures including
preliminary and concluding software tasks.
Transport
no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly, rack
installation
yes
Reassembling the server, installing the
server in the rack (if applicable).
Starting up
no
Booting time depends on hardware and
software configuration and may vary
significantly.
Table 1: Calculation of the average task duration
2.4
Tools you need at hand
When preparing the maintenance task, ensure that all required tools are
available. You will find a list of required tools at the beginning of each
procedure.
Before you start
RX4770 M6
Upgrade and Maintenance Manual
25
Содержание PRIMERGY RX4770 M6
Страница 80: ...Basic hardware procedures 80 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 166: ...Hard disk drive HDD solid state disk SSD 166 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 298: ...Liquid cooling LC 298 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 314: ...Accessible drives 314 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 386: ... Resuming BitLocker functionality on page 104 System board and components 386 Upgrade and Maintenance Manual RX4770 M6 ...
Страница 420: ...FUJITSU Server PRIMERGY RX4770 M6 System Cabling Overview System Cabling Overview English Cable Plan for November 2020 ...
Страница 428: ...9 RX4770 M6 Power 8x2 5 Cable Plan System Board BTM D3892 A100 C100 PWR 1 8x 2 5 HDD Backplane 1 PWR CA05950 2195 ...